Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑industry Standard ❑Professional Engineer <br /> IJ!Other(,Specify) _ <br /> Test Method Used: X Pressure Vacuum D Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br /> Piping Run 99 Piping Run# Piping Run #u Piping Run # �. <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith �— <br /> Piping Diameter: 3" _ <br /> Length of Pipbig Run: Approx. 80' <br /> Product Stored: Diesel <br /> Method and location of Test boot at UDC 21 m <br /> piping-run isolation: thru 27s I <br /> Wait time between applying 30 Minutes <br /> pressure and starting test: <br /> Test Start Time: 1:20 <br /> Initial Reading(Rj): 5 Psi <br /> Test End Time: �5�Psi <br /> 20 <br /> _ ... <br /> Final Reading(RF): <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi <br /> Pass/Fail Threshold or <br /> No Loss in Psi <br /> Criteria: <br /> � Test Result: X Pass ❑Fail Pass ❑ Fail Pass ❑Fail Pass Fail <br /> C o til Ill e n is— (inchide information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Page 6 of 17 <br />