Laserfiche WebLink
k. <br /> Document Number: 909 R 5003 <br /> PILKINGTON <br /> Procedure _ Rev: 5 Date: 5124107 <br /> EMERGENCY-RESPONSE PROCEDURES <br /> • any type of waste resulting from the release or clean-up of a hazardous <br /> 1 chemical should be handled according to the appropriate regulations. <br /> • if used, outside contractors are responsible for securing any recovered waste <br /> in appropriate container(s). Containers will be properly labeled by the <br /> contractor. <br /> • where Pilkington is responsible for securing. recovered waste, such material <br /> will be placed into appropriate containers and labeled. <br />{ • recovered waste will be storedAn the HWB until disposal can be arranged. <br /> Storage time will _not exceed regulatory requirements. <br /> Disposal of Recovered Waste Y. .. <br /> • Pilkington and specifically, the ENVIRONMENTAL Manager or Environmental <br /> Coordinator will be responsible1lor arranging for the transportation and <br /> disposal of any recovered material. <br /> • transportation and disposal will be with approved firms. <br /> • if appropriate, an attempt will be made to.-match recovered waste material <br />' with an existing hazardous waste profile.. If necessary, forms should be <br /> completed to establish a new profile for the purpose of disposing of the <br /> waste. , <br /> • disposal of recovered material will be done promptly and not exceed . <br /> i regulatory requirements. , <br /> I Equipment Maintenance <br /> • any equipment used during the3emergency will be evaluated to determine <br /> whether it should cleaned, repaired, and returned to service or disposed. <br /> • supplies will be linventoried to determine whether to reorder. .Restocking will <br /> be undertaken as needed. <br /> Post-Emergency Reporting <br /> • depending upon the nature of the emergency, follow-up.reports are often <br /> required by regulatory agencies. <br /> 909R5003 Rev. 5/20/04 <br /> I <br />