My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
400
>
2200 - Hazardous Waste Program
>
PR0513909
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 1:21:58 PM
Creation date
11/2/2018 8:16:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513909
PE
2226
FACILITY_ID
FA0009574
FACILITY_NAME
INTERNATIONAL PAPER
STREET_NUMBER
400
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
400 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\400\PR0513909\COMPLIANCE INFO\2010\OIR 06-18-10.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE <br /> Procedure #: 020-0003 Title: <br /> Issue#: 8 ■ ■j Temp n jan <br /> Issue Date: 9/27/2011 Emergency Procedures: <br /> Supersedes Date: 8/5/2011 Spill Response <br /> 4.0 Responsibility <br /> 4.1 The General Manager(GM)is responsible for ensuring there is adequate planning,resources and <br /> general oversight for the administration of this procedure. <br /> 4.2 The Production Manager(PM)is responsible to the GM for: <br /> • Ensuring adequate equipment,supplies and materials are on hand to conduct this procedure. <br /> • Ensuring adequate supervision is maintained over this procedure to protect affected <br /> employees and the assets of the company. <br /> • Direct oversight in the execution of this procedure. <br /> 4.3 The EHS Coordinator is responsible to the PM for: <br /> • Serving as the Emergency Environmental Coordinator for the facility. <br /> • Providing assessment and evaluation of the emergency spill and determining a policy <br /> compliant response. <br /> • Coordinating activities and communication with corporate or contracted 24-hour responders. <br /> 4.4 The Human Resources Manager(HR)is responsible to the GM for: <br /> • Providing adequate procedures and training materials for the conduct of this procedure. <br /> • Maintaining training records relevant to this procedure. <br /> 4.5 The Production Superintendent and Supervisors are responsible to the PM for: <br /> • providing direct supervision over employees in the conduct of this procedure. <br /> • The Shift Supervisor responsible for the area of the spill is the Supervisor-In-Charge of the <br /> Incidental Spill Response Team. <br /> 4.6 The Maintenance Supervisor is responsible to the PM for <br /> • the maintenance of facilities and equipment needed or used in the conduct of this procedure. <br /> 4.7 The Supervisor-In-Charge, the Maintenance Crew on duty and employees local to the spill make up the <br /> Incidental Spill Response Team. <br /> 4.8 All employees are responsible to their immediate superior for demonstrating compliance with the <br /> elements of this procedure. <br /> 5.0 Safety <br /> 5.1 All safety rules,regulations and procedures will be observed while carrying out the activities associated <br /> with this procedure. <br /> Issued By:Jim Dacayanan Authorized By:Bill Lewis Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.