My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
2300 - Underground Storage Tank Program
>
PR0231039
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:52:34 PM
Creation date
11/2/2018 4:16:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231039
PE
2361
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\139\PR0231039\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
2/29/2012 8:00:00 AM
QuestysRecordID
119913
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVENTORY RECONC11 "ATION <br /> INVENTORY MEASUREMENT METHOD: X ELECTRONIC <br /> INVENTORY EQUIPMENT: Veeder-Root TLS-350 MAG 1 Probe Series 847390 <br /> The Chevron Operator at the facility will complete daily product inventory reconciliation. <br /> 1) Approved meters for tank inputs and withdrawals in accordance with CCR Title 4, Chapter 9, <br /> Subchapter 1 Tolerance and Specifications for Commercial weighing and measuring devices. <br /> 2) Inventory reconciliation "exceeding a variation of 1.0 percent of the monthly metered sales <br /> plus 130 gallons must be investigated in accordance with this section." <br /> 3) The inventory will be reconciled monthly by the Operator, and: <br /> Should inventory reconciliation indicate a loss greater than specified, the investigative steps <br /> outlined in California Code of Regulations, Title 23 Waters, Subchapter 16 Underground Tank <br /> Regulations, Article 4, Section 2646(k), will be implemented. <br /> 4) Annually the Operator will submit the attached inventory certification form to the local agency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.