My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
1034
>
2300 - Underground Storage Tank Program
>
PR0506198
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 2:49:47 PM
Creation date
11/2/2018 4:25:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506198
PE
2381
FACILITY_ID
FA0007268
FACILITY_NAME
UNOCAL STATION #0123 (FORMER)
STREET_NUMBER
1034
STREET_NAME
CENTRAL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23517128
CURRENT_STATUS
02
SITE_LOCATION
1034 CENTRAL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTRAL\1034\PR0506198\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII. PERMIT PROCEDURES <br /> 1. The permit is a written authorization and approval for work that <br /> requires entrance into a permit-required confined space (see <br /> Appendix A). <br /> 2. The permit specifies the permit space and type of work to be done. <br /> 3. The permit specifies the date and authorized duration of the entry <br /> permit. <br /> 4. The permit identifies each Authorized Entrant within the permit space. <br /> 5. The permit identifies, by name, the Attendant(s). <br /> 6. The permit identifies, by name, the Entry Supervisor. <br /> 7. The permit identifies the hazards of the space, measures to isolate and <br /> eliminate or control hazards of the space before entry, acceptable entry <br /> conditions, results of initial and periodic tests, emergency procedures, <br /> communication procedures used by Entrants, and equipment to be <br /> provided. <br /> 8. Canceled permits will be used by the safety staff to review the permit- <br /> required confined space Program on an annual basis. <br /> 9. The Project Safety Officer shall be responsible for securing the permit <br /> from the Company Safety Officer. <br /> • The permit should be obtained at least 24 to 48 hours in advance of <br /> entry so that all pre-entry requirements can be completed and the entry <br /> conducted on schedule. <br /> 10. The Company Safety Officer or Branch Safety Officer shall review each <br /> portion of the permit with the Entry Supervisor. <br /> ADNMS/CONSP 10 June 2. 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.