My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Air Handlers <br /> Each component of the air handling system is to be inspected and tested. <br /> The unit should be started and stopped. <br /> If there are isolation dampers then the damper's operation is to be verified. <br /> Each temperature and humidity sensor is to be checked and follow the same <br /> calibration/replacement criteria as the space temperatures and humidity. <br /> Each valve on the unit is to be cycled and verified. Mechanical cooling is to be cycled as <br /> well as mixed air dampers. <br /> Rooftop Unit Sy stems <br /> Same as air handlers. <br /> CRU Systems <br /> Same as air handlers. <br /> Under Floor Water Alarms <br /> These alarms are generally associated with a CRU but not always. <br /> Each water detector is to be tested by introducing water to the sensor and verifying <br /> operation. <br /> Shorting out alarm wires will not be acceptable. <br /> Permalert <br /> In some facilities there is a more sophisticated system of water monitoring. <br /> Some are Liebert and some are Permalert utilizing tape with sensors strategically located <br /> within so many feet of each other <br /> These are to be tested in the same manor as under floor water detectors. <br /> Chillers <br /> Each component of the chiller is to be tested as best as can be reasonably expected. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.