My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 4:15:38 PM
Creation date
11/2/2018 8:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWjCB, January 2002 Page of� <br /> 5. SECONDARY PIPE TESTING <br /> 'fest Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> © Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum 0 Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution; 1110-15 PSI <br /> g Pilling Run #1 Piping Run #2 Piping Run 93 Piping Run #4 <br /> Piping Material: Poly Poly Fiberglass Fiberglass <br /> Piping Manufacturer: Environ Environ Smith Smith <br /> Piping Diameter: 1 Y2" l/ Yz" 3" 3'$ <br /> Length of Piping Run: Approx. 125' Approx. 125' Approx. 120' Approx.20' <br /> Product Stored: Regular 87 Super 91 Gasoline Vapor Regular Vent <br /> Method and location of Test Boot at Test Boot at <br /> Test boot at STP#1 Test boot at 5TP#2 <br /> piping-run isolation: UDC# 1&2 Vent Stack <br /> I Wait time between applying 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> pressure and stattin test: <br /> Test Start Time: 11:50 11:50 12:00 12:10 <br /> Initial Reading(RI): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 12:50 12:50 1:00 1:10 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi a Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria; <br /> Test Result: L X—PassF] Fail X Pass ❑ Fail X Pass CI Fail X Pass Fail <br /> Cointnents — (include infarnration on repairs made prior to testing, and recommended fallow-up f©r failed tests) <br /> Page 3 of$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.