Laserfiche WebLink
• �, . <br /> SWLC13, January 2002 0 <br /> Page ot-__ <br /> 5. SECONDARY PIPE TESTING <br /> 'rest Method Developed By: X Piping Manufacturer i7 Industry Standard D Professional Engineer � �! <br /> Q Other(Sped) I <br /> Test Method Used: X Pressure D Vacuum <br /> Q Hydrostatic <br /> Q Other(Specify) <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br /> Piping Run #5 Piping Run# Piping Run #` Piping Run 0 - <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith, <br /> Piping Diameter; 33* <br /> Length of Piping Run; Approx,20' <br /> Product Stored: Super Vent <br /> Method and location of Test Boot at <br /> i in -run isolation: Vent Stack <br /> Wait tune between applying __II <br /> ressure and startin test: 15 Minutes <br /> Test Start Tune: 12;15 ---- <br /> Initial Reading(Rj): 5 Psi - <br /> Test End Time: 1:15 -- <br /> Final Leading(RF): 5 Psi <br /> Test Duration; 1 Hour — - <br /> Change in Leading(RF-R,): 0 Psi <br /> Pass/Fail Threshold or <br /> Criteria: No Loss in Psi <br /> Test Result: X Pass f�Flail Pass © Fail Pass ®Fail Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommendedfollow-up for ailed tests) <br /> Page 9 of'% <br />