My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 4:15:38 PM
Creation date
11/2/2018 8:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• �, . <br /> SWLC13, January 2002 0 <br /> Page ot-__ <br /> 5. SECONDARY PIPE TESTING <br /> 'rest Method Developed By: X Piping Manufacturer i7 Industry Standard D Professional Engineer � �! <br /> Q Other(Sped) I <br /> Test Method Used: X Pressure D Vacuum <br /> Q Hydrostatic <br /> Q Other(Specify) <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br /> Piping Run #5 Piping Run# Piping Run #` Piping Run 0 - <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith, <br /> Piping Diameter; 33* <br /> Length of Piping Run; Approx,20' <br /> Product Stored: Super Vent <br /> Method and location of Test Boot at <br /> i in -run isolation: Vent Stack <br /> Wait tune between applying __II <br /> ressure and startin test: 15 Minutes <br /> Test Start Tune: 12;15 ---- <br /> Initial Reading(Rj): 5 Psi - <br /> Test End Time: 1:15 -- <br /> Final Leading(RF): 5 Psi <br /> Test Duration; 1 Hour — - <br /> Change in Leading(RF-R,): 0 Psi <br /> Pass/Fail Threshold or <br /> Criteria: No Loss in Psi <br /> Test Result: X Pass f�Flail Pass © Fail Pass ®Fail Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommendedfollow-up for ailed tests) <br /> Page 9 of'% <br />
The URL can be used to link to this page
Your browser does not support the video tag.