Laserfiche WebLink
�AXEIVEE <br /> MAR 2 7 2015 <br /> SWRCB,January 2002 IA -rALof— <br /> 5. SECONDARY PIPE TESTING „�..�,,,.� <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> F1 Other(Spec) <br /> 1 cit lyuipmcnt l3eJ PrCSWI CAUUeC in Psih:quipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material Poly Plastic Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Environ Ameron Ameron Ameron <br /> Piping Diameter: 3" 4" 4" 4" <br /> Length of Piping Run: Approx.6' Approx.6' Approx.6' Approx. 10' <br /> Product Stored: Jet A Jet A let A Jet A <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at Return <br /> piping-run isolation: Piping Sump 41 Piping Sump#2 Piping Sump#3 Piping Sump#1 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:30 10:40 11:05 11:25 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:30 11:40 12:05 12:25 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-Rt): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />