My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 „r},'1ge nr of <br /> 6.SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard i Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> -1 Other(Specify) <br /> -I c,t I[quipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> ti Piping Run#5 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: Approx.7' <br /> Product Stored: Jet A <br /> Method and location of Test boot at Return <br /> piping-run isolation: Piping Sump#2 <br /> Wait time between applying 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:50 <br /> Initial Reading(R,): 3 Psi <br /> Test End Time: 11:50 <br /> Final Reading(RF): 3 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RP-R,): 0 Psi <br /> Pass/Fail Threshold or No detectable loss <br /> Criteria: <br /> Test Result: Pass <br /> Comments— (include information on repairs made prior to testing and recommendedfollow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.