Laserfiche WebLink
SWRCB,January 2002 Pagc,of <br /> 7. PIPING SUMP 'NESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change indicator F-gLlipment Resolution: .002 <br /> Sump# I Sump#2 Sump#3 Sump#4 <br /> sump Diameter: 42" 42" 42" 42„ <br /> Sump Depth: 39" 42" 44" 39" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 26„ 36„ 38" 21" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 249t 21" 38" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Level 28" Water Level 38" Water Level 40" Water Level 28" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> roduct and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe yes <br /> shutdown?` Yes Yes Yes <br /> Was fail-safe verified to be No No No <br /> operational?* No <br /> Wait time between applying water <br /> and startin test: S Minutes 5 Minutes 5 Minutes 5 Minutes <br /> Test Start Time: 9:35 9:30 10:25 10:20 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 10:05 10:00 10:55 10:50 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005130 Minutes .005130 Minutes .005130 Minutes .005130 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail <br /> Was sensor removed for testing? X Yes - No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No NA X Yes ❑No ❑NA X Yes ❑No INA X Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended ollow-up or ailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to ani of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />