Laserfiche WebLink
9. The Manteca site plan sheet T-3 illustrates an existing 48" double wall polysided fiberglass <br /> containment sump. Item hexagon 33 lists a conduit entry fitting for round sumps. Correct the <br /> discrepancies. Submit corrected version. <br /> Response: The actual point-of-entry for the product line will occur at the round part of the <br /> existing sump. Only the bottom 24-inches of the existing sumps are flat sided (polysided). <br /> The upper portion of the sump is round. See Elevation View D for point-of-entry of the <br /> product line. <br /> 10. The site plan sheet T-5 hexagon item 24 describes a magnetostrictive probe 0.1 GPH w/o <br /> water detection model number VR 846391-601 but the manufacturer's cut sheet provided <br /> states 0.1 GPH leak detection model number as VR 846391-401 and probe for inventory only <br /> as VR 846391-601. Correct the discrepancies. Submit corrected version. <br /> Response: The description for Item 24 on Sheet T-5 has been revised to identify the <br /> probe as inventory only. <br /> 11. Provide the following current install/manufacturer training certification: ICC install/retrofit, ICC <br /> service tech, Containment Solution tank and sump, FE Petro leak detector, Veeder-root <br /> Certification Technician, Bravo DoubleWall, Bravo Retrofit, Bravo F-Series, OPW spill <br /> container, Flexing-Flex connectors, and Ameron Dualoy. <br /> Response: Current install/manufacturer certifications have been included in this <br /> resubmittal. The installer completed the training class on December 20, 2012, but he has not <br /> received his certification document from Blue Line. We will forward the certification as soon <br /> as it is provided. <br /> COMMENTS PROVIDED BY: GARRETT BACKUS,SENIOR REHS I TELEPHONE: (209)468-2986 <br /> 1616 EAST HAMMER LANE,STOCKTON,CALIFORNIA 95210 <br /> COSTco Loc. No.381 OUR JOB No. 10199 <br /> 1. The overfill prevention method for the Lubrizol tank must be in compliance with Title 23 <br /> California Code of Regulations section 2635(b)(2). Only one of the methods listed in this <br /> section is required. The method listed in the monitoring plan issued to satisfy the regulation. <br /> Other methods can be also be used in addition. <br /> One method is "external audio/visual alarm set at 90% of tank capacity" which was initially <br /> written in the Lubrizol tank monitoring plan. This statement can be returned to the comments <br /> section of the Lubrizol monitoring plan and the external audio/visual alarm will be tested <br /> during the install. Also add this method to page 7 of the install permit application. <br /> A second method is "Provide positive shut-off of flow to the tank when the tank is filled to no <br /> more than 95 percent of capacity"which cannot be used with an DPW 61fSTOP since a light <br /> shutoff is not achieved in the closed position,"according to the OPW cut sheet. <br /> A third method is "Restrict delivery of flow to the tank at least 30 minutes before the tank <br /> overfills, provided the restriction occurs when the tank is filled to no more than 95 percent of <br /> capacity,and activate an audible alarm at least five minutes before the tank overfills." <br /> If the third method will be listed in the monitoring plan to satisfy the 2635(b)(2) regulation then <br /> provide the following to use the third method. tank chart for the Lubrizol tank to determine <br /> the property OPW 61fSTOP length for 95% shutoff, OPS 61fSTOP instructions to set the <br /> valve at 95% tank capacity, and assurance that the Lubrizol delivery into the tank will be <br /> maintained at 25 gallons per minute as per the OPW 61 fSTOP specification. Also include the <br /> following statement in the monitoring plan comments: "Overflow prevention is achieved by <br /> 12919c.039.dm <br />