My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEA GRAVEL CRUSHED STONE <br />Approved Gravel Approved Crushed Stone <br />Must consist of clean, or Crushed Gravel <br />naturally -rounded aggregate Must be washed with angular <br />with a mix of particle sizes particle size not less <br />not less than 118" or more <br />than 118" or more than 112". <br />than 3/4". <br />No more than 5% may <br />No more than 5% <br />pass the #8 sieve, <br />may pass the #8 sieve. <br />Dry gravel density must <br />Dry gravel density must <br />be a minimum of 95 pounds <br />be a minimum of 95 pounds <br />per cubic foot. <br />per cubic foot. <br />Note: If material which meets these specifications is <br />not available, contact the Containment Solutions Tank <br />Technical Support department for information on <br />approved alternate materials and installation instruc- <br />tions. Using other than approved bedding and backfill <br />materials without Containment Solutions's prior writ- <br />ten approval will void the tank warranty and may result <br />in tank failure. <br />DO NOT <br />♦ Mix approved backfill with sand or native soil. <br />♦ Backfill tank with sand or native soil. <br />CAUTION <br />Using unapproved backfill material may <br />result in tank failure and environmental <br />contamination. <br />A3. PRE -INSTALLATION TESTING <br />Do not pressurize tanks over 5 psi (3 PSI FOR 12' <br />DIAMETER TANKS). Tank damage or physical injury <br />can result. <br />♦ Make sure you understand these instructions. If in <br />doubt, call Tank Technical Support. <br />VISUAL AIR/SOAP TEST - TO BE PERFORMED ON <br />ALL TANKS PRIOR TO INSTALLATION. <br />❑ Warm weather soap solution - 5 gallons of water <br />with 8 ounces of household dishwashing detergent. <br />❑ Freezing conditions soap solution - substitute 1 gal- <br />lon of automotive windshield washer solution for 1 <br />gallon of water. <br />❑ Cover entire tank outer surface with soap solution. <br />(Exception - double-wall tanks with liquid filled an- <br />nular space.) <br />❑ Cover all fittings with soap solution. <br />❑ Carefully inspect for leaks as indicated by bubbles. <br />❑ Roll tank to inspect bottom. Ensure fittings and/or <br />collars do not contact ground. <br />♦ In the unlikely event a tank leak is discovered, discon- <br />tinue the installation and immediately call Contain- <br />ment Solutions Field Service to schedule a repair. <br />♦ Prepare fittings for testing <br />❑ Remove fitting plugs. <br />❑ Clean factory pipe dope from plugs and fittings. <br />❑ Apply pipe dope suitable for the material being <br />stored in the tank. <br />❑ Reinstall and tighten fitting plugs. <br />TESTING SINGLE-WALL TANKS <br />These tests must be performed before installing tanks: <br />♦ Pressurize tanks. <br />❑ 4' through 10' diameter tanks to 5 psi maximum. <br />12' diameter tanks to 3 psi maximum. <br />❑ A contractor supplied pressure relief valve must be <br />connected to the primary tank for additional pro- <br />tection. The relief valve should be sized and set <br />to prevent the tank from being pressurized in ex- <br />cess of the maximum allowed test pressure. <br />♦ Maintain test pressure and continue inspection for at <br />least 30 minutes. <br />♦ At the same time, cover tank outer surface with soap <br />solution (see Visual Air/Soap Test). <br />DO <br />♦ Use a maximum 15 psi air gauge with '/ or 1/2 Ib. <br />increments. <br />♦ DO NOT approach endcaps or manways while <br />tanks are under pressure. This could result in <br />personal injury. <br />♦ DO NOT lift or hoist a tank under pressure. This <br />could result in personal injury. <br />DO NOT <br />♦ Use a vacuum gauge in lieu of a pressure gauge. <br />TESTING DOUBLE-WALL TANKS WITH DRY <br />ANNULARSPACE <br />This section is for tanks which do not have monitoring tracer <br />fluid installed. If tank arrives at site with monitoring fluid <br />installed, use instructions for Double -Wall Tanks with Annular <br />Space Filled on page 5. <br />CONTINUED ON PAGE 5 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.