My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For All Tests: <br />00 <br />♦ Install air gauge at the fitting where the air pressure hose <br />is connected to the primary tank. <br />♦ I nstall a second gauge in some other primary tank fitting <br />to use as a check against the first primary tank gauge <br />to insure that the tank is not over pressurized. <br />♦ Install a third gauge connected to the annular space <br />at the manifold assembly. <br />♦ Use a maximum 15 psi air gauge with 1/ or'/2 Ib. in- <br />crements. <br />♦ A contractor supplied pressure relief valve must be con- <br />nected to the primary tank for additional protection. The <br />relief valve should be sized and set to prevent the tank <br />from being pressurized in excess of the maximum al- <br />lowed test pressure. <br />DO NOT <br />♦ Lift or hoist a tank under pressure. This could result in <br />personal injury. <br />CAUTION <br />DO NOT Connect the air supply directly to the an- <br />nular space monitoring fitting or tank damage will <br />result. <br />Outer Wall Test <br />PRESSURIZING TANK <br />Step 1 <br />Close manifold valve between primary tank and <br />annular space (see figure 3). <br />Step 2 <br />Pressurize primary tank to 5 psi maximum. <br />Step 3 <br />Use a pressure relief valve. <br />CAUTION <br />Do not connect the air supply directly to the <br />annular space monitoring fitting or tank damage <br />will result. <br />Air supply <br />valve open <br />FIGURE 3 <br />Manifold <br />= to air supply valve <br />Closed <br />-Air gauge <br />I Air gauge <br />Manifold systei <br />(supplied with tan <br />Annular space fitting or Reservoir <br />REMOVE AIR SUPPLY <br />Step 1 <br />Close the air supply valve to the primary tank. <br />Step 2 <br />Disconnect the air supply (see figure 4). <br />PRESSURIZE ANNULAR SPACE <br />Step 1 <br />Open the manifold valve in order to pressurize the tank <br />annular space (see figure 4). <br />Step 2 <br />Pressure in primary tank may drop slightly. <br />FIGURE 4 <br />Air supply —To air supply Manifold <br />valve dosed (disconnected) valve open <br />Air gauge <br />Air gauge <br />Manifold system <br />(suppled vnlh tank) <br />Annular space fitting or Reservoir <br />VISUAL AIR/SOAP TEST <br />Step 1 <br />Monitor the pressure readings for at least 30 minutes. <br />Step 2 <br />At the same time, cover tank outer surface with soap <br />solution (see Visual Air/Soap Test). <br />Step 3 <br />Carefully inspect for leaks as indicated by bubbles. <br />Inner Wall Test <br />Step 1 <br />Close manifold valve to annular space. <br />Step 2 <br />Open air supply valve to vent primary tank. <br />Step 3 <br />Maintain 5 psi pressure on the annular space. <br />Step 4 <br />Monitor air gauge on tank for another 30 minutes, but <br />not more than 60 minutes. <br />After successfully completing air test: <br />Step 1 <br />Release pressure. <br />Step 2 <br />Disconnect and remove air manifold fittings, hose and valve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.