Laserfiche WebLink
SWRCB,January 2002 • • Page—of_ <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: Pressure 0 vacuum 0 Hydrostatic <br /> C Other(Sped) <br /> Test Equipment Used: p tTR�c�c�L� Equipment Resolution: o.O 1 PSI <br /> s iM.V xYw6Yi'4. r,yra14S`+ <br /> Piping Run# /-k7 Piping Run#2-%1 Piping Run PipingRung <br /> Piping Material: <br /> Piping Manufacturer: A-0. SH t W A,.'() Si I i T[{ A,O.SM t TI-I <br /> Piping Diameter: 2,'- 3 " 7-'- 3 <br /> Length of Piping Run: 1-2-5 r I' "t t Ls <br /> Product Stored: JD L044 Sovaam E Q I c St <br /> Method and location of IFASr �,T- 7FFfT- ter TC,sTi <br /> Piping-run isolation: Ptpkoit sumo I-IP1A1aV gayv p.,P"/py Wy l e <br /> Wait time between applying <br /> pressure/vacuum/water and1 1 40 "l <br /> 0 Mt <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(It): PSI 6 IySI <br /> Test End Time: /o; -6a A4,11 /I : 3D Mkt 1 ;043 l�iy <br /> Final Reading(RF): S PS/ 5/�,s 1 6' PS / <br /> Test Duration: /fQ / 9-a / N-O-- <br /> Change in Reading(RF-Rj): O f::61 O /-;Is I p PS I <br /> Pass/Fail Threshold or <br /> Criteria: - O IBI �/- O <br /> Test Result: Ix Pass 0 Fail Pass 0 Fail Pass ❑Fail 0 Pass 0 Fail <br /> Comments- (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />