My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • • Page—of_ <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: Pressure 0 vacuum 0 Hydrostatic <br /> C Other(Sped) <br /> Test Equipment Used: p tTR�c�c�L� Equipment Resolution: o.O 1 PSI <br /> s iM.V xYw6Yi'4. r,yra14S`+ <br /> Piping Run# /-k7 Piping Run#2-%1 Piping Run PipingRung <br /> Piping Material: <br /> Piping Manufacturer: A-0. SH t W A,.'() Si I i T[{ A,O.SM t TI-I <br /> Piping Diameter: 2,'- 3 " 7-'- 3 <br /> Length of Piping Run: 1-2-5 r I' "t t Ls <br /> Product Stored: JD L044 Sovaam E Q I c St <br /> Method and location of IFASr �,T- 7FFfT- ter TC,sTi <br /> Piping-run isolation: Ptpkoit sumo I-IP1A1aV gayv p.,P"/py Wy l e <br /> Wait time between applying <br /> pressure/vacuum/water and1 1 40 "l <br /> 0 Mt <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(It): PSI 6 IySI <br /> Test End Time: /o; -6a A4,11 /I : 3D Mkt 1 ;043 l�iy <br /> Final Reading(RF): S PS/ 5/�,s 1 6' PS / <br /> Test Duration: /fQ / 9-a / N-O-- <br /> Change in Reading(RF-Rj): O f::61 O /-;Is I p PS I <br /> Pass/Fail Threshold or <br /> Criteria: - O IBI �/- O <br /> Test Result: Ix Pass 0 Fail Pass 0 Fail Pass ❑Fail 0 Pass 0 Fail <br /> Comments- (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.