Laserfiche WebLink
� • ✓ <br /> 3.21 SITE SECURITY <br /> Site security and site control will be the responsibility of the Superintendent with <br /> assistance from all personnel that may notice any non-routine activities or notice individuals on <br /> the site that have not been identified as Geofon employees or subcontractors. <br /> 3.22 ENVIRONMENTAL PROTECTION PLAN <br /> The purpose of this plan is to prevent environmental pollution and damage by the <br /> presence of"chemical, physical, or biological elements or agents which adversely affect human <br /> health or welfare; unfavorably alter ecological balances of importance to human life; affect other <br /> species of importance to man; or degrade the utility of the environment for aesthetic, cultural <br /> and/or historical purpose." Areas of consideration are air, water, and soil, including land <br /> formations,biotic components of the remediation area, noise, solid waste and other pollutants. <br /> The following measures will be taken to protect the environment: <br /> Dust Abatement <br /> The release of particulate matter may occur during excavation and operations. The <br /> amount of particulate matter generated is anticipated to be minimal. Care will be taken to avoid <br /> the generation of visible dust from work activities. Motorized equipment will be operated at <br /> speeds that will not cause undue release of particulate matter. Water sprinkling of construction <br /> zones, along haul routes, in equipment parking areas, and in waste areas will be implemented. <br /> All disturbed excavation areas, upon completion of work, will be sprayed with water for dust <br /> suppression at a rate sufficient to inhibit generation of airborne particulate matter. <br /> Exhaust and Burning of Rubbish/Debris <br /> Standard engineering devices will control all vehicular exhaust. Open burning of rubbish <br /> and debris will not be done on the site. <br /> 28 <br />