Laserfiche WebLink
% .. .-/ <br /> Land and Water Resources <br /> All land resources within the project boundaries will be preserved in their present <br /> condition or restored to a condition after completion of the project that will appear to be natural <br /> and not detract from the appearance of the site. Prior to beginning the work, Geofon will <br /> identify any land resources to be protected in the vicinity of the work area. This include, but is <br /> not limited to, the marking of utility lines, vegetation of environmental concern, land formations, <br /> nesting, hunting or otherwise inhabited areas of protected species. There are no wetlands at the <br /> work area of the project site that needs protective measures. <br /> Marking methods will include flagging, fencing or other delineation in such a manner as <br /> to be identified as a protected source. There is no expectation that it will be necessary to clear <br /> and grub significant areas. All vehicle traffic will be limited to the construction area and <br /> established roads. <br /> Onsite Chemical Storase <br /> Fuels, oils, antifreeze and any other chemicals with the potential to degrade surface and <br /> groundwater will be stored and disposed of in a method that is approved by the EPA and the <br /> State of California. <br /> Work Areas <br /> Only authorized personnel will be allowed in the restricted area (contamination reduction <br /> zone and the exclusion zone). Personal vehicles will not be allowed in the restricted area. Only <br /> equipment required for the project will be allowed into the exclusion zone and will not be <br /> removed until that specific piece of equipment is no longer needed. Equipment and vehicles will <br /> be decontaminated prior to removal from the exclusion zone. <br /> SII <br /> 29 <br />