								      											AREA   PLAN				SCALE:  1" =  30'  										ENLARGED   AREA   PLAN 						SCALE:  1/8"=r-O"     							TANK   INSTALLATION   NOTES									GENERAL   ELECTRICAL   NOTES
<br />       																												u 																				(    INSTALL 8,000  GALLON  MODERN WELDING-ENVIRO  16  DOUBLE WALL  STEEL TANK WITH VEEDER-ROOT TLS-350 ALARM  SYSTEM.
<br />      																									USTREET
<br />       																												I�      																				TANK   TO  BE SET 60" MINIMUM  BELOW FIN.  GRD.  CONTRACTOR TO  FIELD  DETERMINE  EXACT BURY DEPTH.  BACK  FILL WITH  CLEAN	INSULATED FLANGES & KIT OR SHORT SECTION OF PVC CONDUIT TO
<br />										WEST   LTM   JTREE l       																																	WASHED   SAND.    																				PBE USED ON ENETRATION. ALL UNDERGROUND PIPING & CONDUITS AFTER BUILDING
<br />										WEST   LL   																																				O INSTALL AN 8'  REINFORCED  CONCRETE TANK SLAB WITH  #4 0  12  BOTH  WAYS.  SET MANHOLE  COVERS 3" ABOVE OUTER  EDGE     	ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION OF THE
<br />    															-  -_      			-   																													OF   SLAB.  (SEE TANK  SECTION)      																	NATIONAL ELECTRIC CODE.   ALL J-BOXES TO BE EXPLOSION  PROOF,
<br /> 																																12  								AC  PAVED  PARKING  LOT       																											KILLARK #GRSS-2   OR CROUSE-HINDS GUA SERIES.
<br />  																																																	O ANNULAR  SPACE MONITOR.   (MANHOLE COVER TO  BE  LOCKABLE & WATERTIGHT.  SEE TANK SECTION)
<br /> 																		VCXAT5CT
<br /> 																				lwc 																				1 								a  4"  FILL RISER.   (MANHOLE COVER TO BE WATERTIGHT.  SEE TANK SECTION     										USE CABLE CONNECTOR FITTINGS (GROUSE-HINDS CGB OR
<br />   						1l�  						1   							H BASIN       																	11  									O      												)'   										EQUIVALENT) AT MONITOR & LEVEL GAUGE CABLE CONNECTIONS TO
<br /> 																																																																									J-BOXES & PIPE FITTINGS IN SUMP BOXES.
<br /> 																																									�								Q5  4" VENT RISER.   (MANHOLE COVER TO  BE WATERTIGHT.   SEE TANK SECTION)
<br /> 																																									1								O6  4" ELECTRONIC TANK  GAUGE PROBE RISER.   (MANHOLE COVER TO  BE LOCKABLE AND WATERTIGHT.  SEE TANK  SECTION)       		BE PVC DCOATED RIGID. ALL ERGROUND  	TCONDUTSS AND   O INSTALLED INSIDE BUILDING MAYNDUITS INSTALLED OUTDOORS
<br />					F"  																															INSTALL TEMPORARY ABOVE(GROUND TANK    																													BE EMT (COMPRESSION TYPE FITTINGS ONLY).
<br /> 																	EE ENLARGED AREA PLAN  												=___�     	PER DETAIL 4, SHEET P4. I								OVEEDER-ROOT  #790091-001  OVERFILL ALARM  & VEEDER-ROOT #790095-001  OVERFILL ALARM ACKNOWLEDGMENT SWITCH  (MUST
<br />  																																									I     								BE PLACED  IN VIEW OF FILL).  EXACT LOCATION TO  BE FIELD  DETERMINED. ALARM SHALL ACTIVATE AT 90% TANK CAPACITY.
<br />					E%		(� 							-       - -       																							1 	18 							PROVIDE  ELECTRICAL  FEED FROM  20 AMP BREAKER  IN  ELECTRICAL PANEL USING  3/4" CONDUIT.      						CONTRACTOR TO PROVIDE & INSTALL PULL BOXES AS REQUIRED TO
<br /> 											[�-+      					� \ 															TEMP.       							19  																														FACILITATE WIRE P
<br />  																																									I       							� INSTALL VEEDER-ROOT TLS-350 PLUS TANK  MONITORING  PANEL,  EXACT LOCATION TO  DETERMINED IN  FIELD.  PROVIDE ELECTRICAL 	ALL EQUIPMENT, HARDWARE AND SYSTEM COMPONENTS MUST BE
<br />  																																									1     								FEED  FROM  (E)  20 AMP BREAKER  IN  EXISTING  ELECTRICAL PANEL.  RETURN  EXISTING TANK  MONITORING  PANEL TO STAN       		INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S
<br />  																																									I     								BRODECKI  0 SBC  ENVIRONMENTAL  MANAGEMENT (925-823-6151).  INSTALLATION  OF VEEDER-ROOT EQUIPMENT MUST BE     		INSTRUCTIONS AND SPECIFICATIONS.
<br />      																																							(N)  12" DETAINING  							PERFORMED  BY A STATE LICSENED  ELECTRICIAN WITH VEEDER-ROOT CERTIFICATION.
<br />  																							(N) CMU WALL																						1   																									ALL CONDUCTORS TO BE THAN CU.
<br />       																																(N) GONG.  WALL, CONSTRUCT 		WALL (BYI OTHERS)    						O9   INSTALL  1" SUPPLY AND  1  1/2" RETURN WESTERN  FIBLEGLASS FLEXIBLE FUEL LINES,  SLOPE  1/4" PER  FOOT TOWARD TANK.       	ALL CONDUITS TO BE MINIMUM 3/4" UNLESS NOTED OTHERWISE.
<br />  																							(BY OTHERS).      							AFTER ENGINE INSTALLATION
<br />     								/     	'�/    							I  							1   							(BY OTHERS)   		LINE OF1 FOOTING  							RUN  LINES INSIDE (1)  4" WESTERN  FIBERGLASS  FLEXIBLE SECONDARY PIPE FROM TANK TO WALL  PENETRATION AT ENGINE ROOM.
<br />   																																							BELOW.  (BYI OTHERS)  							RUN  4" SECONDARY THROUGH  5 9/16" ASTM A53  SON.  40  STEEL CHASE THROUGH AREAWAY  BETWEEN  UNDERGROUND TANK
<br />       																						24    	Zs - _ -													9  20    							AND GENERATOR  ROOM  IN  BASEMENT.  SINGLE WALL  1"  BLACK  STEEL SUPPLY AND  1  1/2" RETURN  PIPING  FROM WALL					r7
<br />					1:14    					U			•   									r�       		15   23						9   					I	3  r")
<br />       																																																	PENETRATION TO GENERATOR. ATTACH  STEEL CHASE TO AREAWAY WALL USING  UNISTRUT PIOOO CHANNEL SEE  DETAIL 1, SHEEP      		HAZARDOUS   AREA A    ATOrrES
<br />      																																				.r-																																								V      11   EA   1V
<br />					Z  																	is  									+<r      -I    w•.+s     					1    				14      			P4.
<br />																																- -								I								10 RUN  (2)  #12 AND (1)  #12 ONO.  FROM  ELECTRICAL PANEL TO VEEDER-ROOT OVERFILL ALARM.
<br /> 																													17       	21 10I    						3 																									IN AN OUTSIDE LOCATION, ANY AREA WITHIN 5'-0" HORIZONTALLY
<br />    																																STEEL       							I 								11 INSTALL 2" DOUBLE WALL VENT LINE.  SLOPE  1/4" PER  FOOT DOWN TO TANK.  (SEE DETAILS).  							FROM ANY TIGHT TANK FILL PIPE SHALL BE CLASSIFIED AS A CLASS
<br />																							22       								SLEEVE   3  					I- 	I   				-1     																										1  DIVISION 2 HAZARDOUS AREA.
<br />   																								e								7			16	I `    			i 				o     			12 INSTALL NEW VENT RISER.  (SEE  DETAILS).
<br />    																								ENGINETHES OF ANY
<br />     																								ROOM 									25     			-  										13  CONTRACTOR TO COMPLETE ALL  EQUIPMENT TESTS REQUIRED  BY GOVERNMENTAL AGENCIES.      							VENTSPHERIPIPE SHALL BE	CLASSIFVOLUMEIIEDAAS CLASS 1  DIVISION  I TANK
<br /> 																																			--   								16																													HAZARDOUS AREA AND FROM 3"-0" TO 5'-0" AS CLASS  1
<br />   																																																	14
<br />       																																																	ALL MANHOLES AND BOXES TO BE  INSTALLED STRAIGHT TRUE,  IN-LINE, AND 3" ABOVE OUTER  EDGE OF SLAB.      					2.
<br />   																																		•  	�-											4 																									ALL ELECTRICAL CONDUITS, FITTINGS, ETC. IN THESE AREAS SHALL
<br /> 																																		REMOVE15  i" SCOTCHKOTED  BLACK  STEEL SUPPLY AND  1  1/2'RETURN  FUEL OIL PIPING INSIDE ENGINE ROOM  (BY OTHERS).      			CONFORM TO THE LATEST EDITION OF N.E.C. ARTICLE 514,
<br /> 																																		EXISTING     							5
<br /> 																																						5-0'      								6 																									ELECTRICAL WIRING AND EQUIPMENT BELOW A HAZARDOUS AREA
<br /> 																																		UMIN.    										16  SENSOR  CONDUIT & CONDUCTOR  RUN.   CONTRACTOR TO RUN  ONLY (1)  BELDEN BELDFOIL #83712  100% SHIELDED CABLE   (16  	SHALL BE RATED FOR CLASS  1  DIVISION  1.  PROVIDE SEAL-OFF
<br />       												N  III   																				PIPING   														AWG MIN.)  WITH  14 CONDUCTORS IN  EACH  CABLE.   CABLE TO CONTAIN  2 CONDUCTORS FOR  EACH SENSOR.   ALL TANK AND
<br /> 																																																																									FITTINGS ON ALL CONDUITS ENTERING OR LEAVING A HAZARDOUS   								'
<br />  													�											0       25
<br />       																																																	PIPING SENSORS TO  BE INCLUDED  IN ONE (1)  HOME RUN  FROM TANK AREA TO TLS-350  MONITOR PANEL.       				AREA,
<br />     																									- --     					o 		--   �- --   													1Q CONSTRUCT STEEL FIRE BOX,  SEE DETAIL 2,  SHEET  P4.  													IMPORTANT  NOTICE
<br /> 															C�
<br />       																-,     																																																							Section 4216 / 4217  of the
<br />					THE   FOLLOWING   REQUIREMENTS   ARE   TO   BE   MET: 																					e    						18 CONTRACTOR TO  REPLACE ANY A/C  PAVING  DAMAGED  DURING  FUELING SYSTEM  INSTALLATION  WITH NEW  4" PAVING OVER 8" CRE.      Government Code  requires a  Dig Alert
<br />					o.  72  HOUR NOTIFICATION PRIOR 70 TANK INSTALLATION.     	NOTE :  LOCAL IMPLEMENTING  																						t9 							SLURRY SEAL-COAT ALL NEW A/C  PAVING.    															Identification  Number be issued  before
<br />      																																																																								a  Permit to  Excavate  will  be valid  For
<br />					b. TANK SYSTEMS TO BE INSPECTED BY CUPA
<br />      															AGENCIES MAY HAVE ADDITIONAL       		90OKWENGINE     BASEMENT     																					CONTRACTOR TO  REPLACE ANY CONCRETE DAMAGED  DURING TANK  SYSTEM  INSTALLATION WITH  NEW CONCRETE TO  MATCH  EXISTING     y
<br />     					AT (3) THREE SEPARATE CONSTRUCTION PHASES:  		REQUIREMENTS      					(BY OTHERS)    IN       																						19 																							our    9 IN  SECTION, SLOPE,  COLOR & KIND.  																		Alerta
<br />       					1. TANK & PRIMARY PIPING HYDROSTATICALLY OR      																																	1     																												Underground
<br />  						PNEUMATICALLY TESTED FOR 30 MINUTES.   																																				2C  CONTRACTOR TO  LOOSELY WRAP WESTERN  FIBERGLASS SECONDARY WITH  INSULATED  12  GAUGE COPPER WIRE  FROM TANK PIPINGService  Alert
<br />																																																		SUMP EXIT POINT TO  DAYLIGHT AT RETAINING WALL.  ATTACH WIRE TO UNISTRUT BOLT AT RETAINING  WALL  PENETRATION. ATTACH
<br />      					2. INSPECTION  E  ALL SECONDARY CONTAINMENT,  																																				PLASTIC SIGN  INSCRIBED WITH  1"  BLACK  LETTERS ON A WHITE BACK-GROUND  ON  RETAINING WALL. SIGN TO  READ "FUEL. PIPE    	r 			CALL: TOLL FREE      	CALL: TOLL FREE
<br />   						INCLUDING TESTING,  IN ACCORDANCE WITH   																		-       																	TRACER".  SEE  DETAIL  1, SHEET P4.   																				1-800-422-4133     	1-800-642-2444
<br />   						MANUFACTURER'S GUIDELINES.   																										AC  PAVED  PARKING  LOT       																																	IN  SOUTHERN  CALIFORNIA   IN NORTHERN  CALIFORNIA
<br />      					3,  FINAL INSPECTION,  INCLUDING ALL PORTIONS OF77   																		21  RUN  (2)  #12 (CONTROLS)  FROM VEEDER-ROOT TANK  MONITORING  PANEL TO VEEDER-ROOT OVERFILL ALARM ACKNOWLEDGMENT	Two Working  Days  Before You  Dig
<br />  						THE LEAK DETECTION SYSTEM.
<br />																																																		SWITCH.
<br /> 					c. TANK SYSTEM  INTEGRITY TESTS FORWARDED & APPROVED      																																		22 RUN   2    																					Engineers  Note to Contractor.
<br />     					BY CUPA PRIOR TO TANK SYSTEM  																																						Q	O  #12   AND  (2)  #12  GND.  FROM  ELECTRICAL PANEL TO VEEDER-ROOT TANK MONITORING  PANEL.
<br />     					BEING PLACED IN OPERATION.   																																																														The  existence  and  location  of an   underground  utilities,     es,
<br />   																																																	z3 INSTALL VEEDER-ROOT #794380-208 SUMP SENSOR  N  FIRE BOX AND AT ENGINE ROAM  FLOOR  LEVEL SEE DETAILS  1  AND 2       						Y 	9     		pipes,       		SEp-ARf'h,
<br />					d.  STATE WATER RESOURCES FORMS (FORMALLY A, B, AND    																																			SHEET P4,																					and/or structures  shown  on these  plans  were obtained  by a  searchfp�,.  ""P..     	-
<br />      					C)  MUST BE COMPLETED & SUBMITTED PRIOR TO TANK 																																																										of available  records.   To the  best  of our knowledge,  there  are  no
<br />      					OPERATION.     																							9FDOWN      																2a INSTALL LOCKING  RECORDS  BOX ON WALL FOR STORAGE OF TLS-350 PRINT-OUTS SEE DETAIL 2 SHEET P5. 				existing  utilities except as shown  on these  plans.  The  contractor
<br />     																																																																								shall  ascertain  the true vertical  and  horizontal  location  and  size of       * ;    #C 19   1
<br /> 					e. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE																																			25 PROVIDE 3M 31  GALLON  PETROLEUM SPILL KITS GRAINGER STOCK  #  5F834 (800-994-2343  EXT.  87375).  (2)  KITS PER SITE. 	those underground  utilities  to  be used  and  shall  be  responsible for
<br />      					SUBMITTED & APPROVED BY CUPA
<br />     																																																																								any damage  to any public  or private  utilities,  shown  or not shown 		SEP       2001
<br />       	o    			PRIOR TO TANK OPERATIONS.   																																																														hereon.       											S'•,,  p10.0�:�Q.
<br />       	E			L  EVIDENCE OF FINANCIAL RESPONSIBILITY SUBMITTED TO
<br />       	a   			CUPA.      																																																																															r"OF CAiFo
<br />      																																																																																							\  �'?j
<br />       	e
<br />       	N
<br />																			UNDERGROUND   TANK   REMOVAL   PROCEDURE  																						UNDERGROUND   PIPING   INSTALLATION   NOTES    										REVISIONS  /  AUFHORIZAIIONS
<br /> 				1.     Contractor  shall  call  U.S.A.  and  have  utilities  field  marked  		12.    Shore  the  edge  of  the  tank  hole,  if required.    All  shoring  is 	19.   If  excavation  is  left  open  overnight,  Contractor  to  completely																															No.			REVISIONS / AUfHORIZATONS    			DATE      BY
<br />       	$       		prior  to  any excavation.  In  addition,  Contractor  shall  make 			to  be  in  place  before  excavating  tank.     						fence  off  the  tank  hole  with  six  (6)  foot  high  temporary chain       			UNDERGROUND  FUEL SYSTEM  PIPING
<br />       	rn•       		visual  and  magnetic  inspection  of  work  area  for  any possible																	link  fencing,  no  exceptions.  A  lockable  gate  shall  be  provided  on  all     																														SUBMITTED FOR PERMIT     					7/17/Dl  MED
<br /> 					underground  utilities  and  conduits.  Contractor  is  responsible  for	13.    Dig  down  to  the  top  of the  tank,     							excavations  left  open  more  than  2  days.  See  plans  for  location.     			INSTALL ALL PIPING PER MANUFACTURER'S INSTALLATION SPECIFICATIONS. CONTRACTOR SHALL AIR PRESSURE TEST ALL PRIMARY &
<br /> 					restoring  any underground  utilities  damaged  during  construction.																																	SECONDARY PIPING PRIOR TO BACKFILLING OR CONNECTING TO TANKS AND GENERATORS.  ISOLATE AND CAP ALL PRIMA    PIPING RUNS  					1     CHANCE UNDERGROUND PIPING SPECIFICATION  		9/29/01 MED
<br />       	• 																	14.    Remove  the fill  (drop)  tube  and  TLS  probe.    Disconnect  the 	20.   Upon  approval  of  SBC  Facility Engineer  and  SBC   Environmental      			& PRESSURIZE TO 75 P.S.I.  (MIN.) FOR 30 MINUTES (MIN.), OR LONGER AS REQUIRED BY LOCAL AGENCY. SOAP TEST ALL JOINTS AND
<br />       	a		2.     Notify SBC  Facilities  Engineer,Ston  Brodecki,  Site  					fill,  gauge,  and  product and  vent  lines.    Cap  or  plug  open    		Manager,  Contractor  shall  install  new   tank.      							INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED AS REQUIRED.  SECONDARY PIPING TO  BE AIR TESTED AFTER CONNECTION IN
<br /> 					Contact,Kathy  Hallinan  and  U.S.A.  forty-eight  (48)  hours  prior  to      	ends  of  the  lines  which  are  not  to  be  used  further.  Remove  any      																	CONTAINMENT SUMP AND IN BUILDING PIPE TRENCH AT 3 P.S.I.  (MIN.) TO 5 P.S.I.  (MAX.)  FOR  30 MINUTES (MIN.), OR LONGER AS
<br />       	o			start  of  tank  removal  or  any  excavation.      						remaining  liquid  from  the  delivery line  using  care  to  avoid     	21.   Replace  or  restore  any existing  site  condition  damaged  or      				REQUIRED BY LOCAL AGENCY.  SOAP TEST ALL CONNECTIONS AND JOINTS AND INSPECT FOR LEAKS  REPAIR ANY LEAKS DISCOVERED AS
<br />       	d																		spillage.       												altered  during  the  tank  removal  and  installation,  remove  sheet       			REQUIRED.  MAINTAIN THE AIR TEST ON THE SECONDARY CONTAINMENT PIPING DURING THE BACKFILLING PROCESS AND VERIFY THAT NO       							PROPRIETARY  SBC  INFORMATION
<br /> 				3.     Close  air  conditioning  inlets  subject  to  fumes  prior  to  work. 																	piling.    															PRESSURE DROP OCCURRED IN THE SECONDARY PIPING.  INSPECT FOR LEAKS.  REPAIR ANY LEAKS DISCOVERED. AFTER BACKRLLING      					NOT  FOR  GENERAL  USE  OR  DISCLOSURE  OUTSIDE  OF  SBC
<br /> 																			15.    Plug  all  tank  openings  with  one  plug  to  have  1/8  inch  vent      																		PIPING RUNS, BOTH PRIMARY AND SECONDARY PIPING SYSTEMS TO BE RETESTED PER AFOREMENTIONED PROCEDURES. THE TESTING OF					ENVIRONMENTAL  MANAGEMENT  UNDER  EXEMPTIONS  SET  FORTH  IN
<br /> 				4.     Fuel  in  existing  underground  tank  shall  be  removed  and  disposed      	hold  for  temperature  expansion.							22.   ALI  water  and  soil  tests  shall  have  results  submitted  to  the    				THE PRIMARY AND SECONDARY PIPING MUST BE WITNESSED BY ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. AFTER       				THE  CALIFORNIA  PUBLIC  RECORDS ACT.  THIS  INFORMATION  MAY
<br /> 					of  by SBC  Contractor.  Contractor shall  furnish  fuel  disposal  																	environmental  management  department  of SBC  within  24  hours      			SUCCESSFUL COMPLETION OF PIPING TEST, CONTRACTOR TO PULL BACK REDUCING BOOT FROM SECONDARY PIPING IN TANK SUMP TO 					ONLY  BE  USED  BY AUTHORIZED  PERSONNEL  OF THE  LOCAL
<br />       	$			documentation  to  SBC.   									1.6.    The  tank  shall  be  made  inert  by using  thirty pounds  of  dry  		after  the  samples  are  taken.      										ALLOW UNRESTRICTED DRAINAGE FROM SECONDARY PIPING SYSTEM INTO THE CONSTANTLY MONITORED TANK SUMP.
<br />     																																																																													GOVERNMENTR    SAND  AUTHOR(ATIONSN FOR  BUECTION  ILDINGS,ITH  APPLICATION  FOR
<br />       	E																		ice  per  thousand  gallons  of  tank  capacity or  as  required																																														AND    OR  ZONING  CHANGES.
<br />       	in		5.     RHL  Design  Group  will  apply for  tank  removal  permit.  Contactor 		by local  authorities.																											TANK  SUMP  HYDROSTATIC TEST       																								DRAWINGS PREPARED FOR
<br /> 					is  responsible  for  picking  up  permit,  paying  fees,  and  arranging
<br />       	oq      		inspections.  All  tank  and  piping  removal  is  by Contractor.   		17.    After  tank  has  been inspected  by local  health  and  fire       																			ALL NEWLY INSTALLED TANKS AND TANKS RETROFITTED WITH  NEW SUMPS OR NEW HARDWARE THAT ENTERS OR  EXITS A SUMP ARE TO
<br />       	N			Contractor  shall  cooperate  with  "Environmental  Contractor"  for  		inspectors,  excavate and  remove  tank  and  piping.  Contractor  to																		BE HYDROSTATIC ALLY TESTED WITH A HEAD OF WATER ONE FOOT ABOVE THE HIGHEST POINT OF PENETRATION OR JOIN.     										ENVIRONMENTAL MANAGEMENT
<br /> 					soil/water  sampling  and  disposal  of  tank.     						load  tank  and  piping  on  transport  provided  by others.  Disposal
<br /> 																				of  tank  and  piping  by Enviro.  Contractor.  Contractor  to  remove  																																																	PACIFIC  REGION
<br />       	0		6.     Provide  fire  extinguishers  of  size  and  rating  specified  by    			and  dispose  of  existing  concrete  tie-down  slab  beneath  tank  if   																ENGINE   ROOM   PIPING   NOTES      				PIPING   AND   CONDUIT   LEGEND
<br />       	i°.     		local  fire  departments.    										specified  in  Scope  of  Work  on  sheet  P-1.  																																																	PROJECT TIIIE:
<br />   																																																	FUEL SUPPLY &  RETURN  PIPING TO BE SCH.  40   ASTM   																			PACIFIC     BELL    FACILITY
<br />       	E   																																																										- - - -    	- - -       TANK MONITORING SYSTEM CONDUITS
<br /> 				7.     There  shall  be  no  welding  or  other  sources  of  ignition  in  the     	18.    After  the  existing  tank  Is  removed,  soil  and/or  water samples     																A-53  BLACK STEEL.
<br /> 					area  while  the  removal  operations  are  in  progress.  There  shall   		will  be  taken  from  the  tank  hole  by the  Environmental       																																																	124  W.   ELM   STREET
<br />       	N       		be  no  smoking  on  the  job  site.  "NO  SMOKING"  signs  shall  be     		Contractor.  If  the  soil/water  samples  are  clean,  then  soil      																	THREADED  FITTINGS TO  BE  150#  MALLEABLE IRON.       								4" FLEXIBLE SECONDARY WITH FLEXIBLE 1" SUPPLY AND  1  1/2"
<br /> 					posted.     													shall  be  disposed  of by Contractor.  If  contamination  is     																																			RETURN PRIMARY PIPES INSIDE.
<br />       	ii     																	discovered,  Contractor  to  notify SBC  Environtmental  Manager																	WELDED FITTINGS TO BE 3000#  FORGED STEEL   SOCKET 																1 						LODI,   CALIFORNIA
<br />       	0		B.     Provide  barricades  with  flashing  yellow  lights  and  warning    			Immediately,  Contaminated  soil  is  to  be  stacked  separately  																	WELD. 										'----------------       3" FRP WITH 2" STEEL VENT PIPING INSIDE
<br /> 					signs  to  protect  pedestrians  and/or  motor  vehicles  from    			on  visqueen  and  covered  with  visqueen  and  anchored  firmly to Lq
<br />     																																																																													LODICA01 								UE020
<br />       	oma+ -     		work  area  and  tank  hole.										prevent  it  from  being  blown  off.  Provide  an  asphalt,  concrete  or  																PIPE FLANGES TO BE  150#  RAISED FACE   THREADED OR    																		SHEET TIRE:
<br />  		o     																	sandbag  berm  around  all  dirt  stack  piles  to  prevent  runoff.  																	SLIP-ON AS REQUIRED.  INSTALL   WITH  1/16" THICK																				STAND-BY   GENERATOR   SUCTION   SYSTEM
<br />       	�,69.     Drain,  and  when  appropriate,  flush  product  in  the  piping  into  the      	Disposal  of  contaminated  soil  will  be  under  separate  contract.      																RING GASKETS AND FLANGE   BOLT & NUT SETS. 																				SITE  PLAN    TANK  REMOVAL,   &   INSTALLATION
<br />  		O     		tank. 														Disposal  of  contaminated  soil  will  be  by Environmental
<br />       	p1 z     																	Contractor.  Contractor  shall  load  contaminated  soil  on  truck
<br />  		D       																																														PIPE WELDING TO BE PERFORMED  BY CERTIFIED   																									NOTES
<br />       	w '     	10.   The  Rinse  Contractor  shall  remove  all  remaining  flammable  liquid       	provided  by Environmental  Contractor.      																					WELDERS.    																										ESTIMATE/ ROUTINE ORDER:
<br />       	c3			from  the  tank  which  can  be  pumped  out.  It  may be  necessary   																																																																	5/25/011     	SCALE: AS NOTED
<br />   		I     		to  use  a  hand  pump  to  remove  the  bottom  few  inches  of   																																COAT STEEL  PIPING WITH  SCOTCH  KOTE 206N.  																									DRAWN III   SIT'N    	CHECKED BY:    MED
<br /> 					product  and  rinsate.  All  residual  liquid  or  sludge,  including    																																																												SBC AUTHORIZATION:
<br />    																																																																																		SHEET:    2      OR    8     sxLETs     SHEET NO.
<br /> 					rinstate  will  be  disposed  of by Environmental  Contractor.       																																REPAIR ANY NICKS OR  SCRATCHES WITH SCOTCH  KOTE     									ARCHITECI'ORB • ENGMEEMIG • RNYIRONOUAL  SBRYICES
<br />    																																																	312, 															rfRJHL   1131 N. MCDOWELL BLVD.  PETALUMA. CA  94954  (707) 765-1660   					SBC DRAWING NO.:  				Q
<br /> 				11.   Sawcut  and  remove  concrete  or  A.C.  cover  for  access  to     																																																	OWN Dr-    JOHN W. JOHNSON, ARCHITECT       JAMES H. RAY, CIVILENGINEERPL
<br /> 					tank   dis  ose  of  concrete  and  A.C.  debris.
<br />
								 |