Laserfiche WebLink
AREA PLAN SCALE: 1" = 30' ENLARGED AREA PLAN SCALE: 1/8"=r-O" TANK INSTALLATION NOTES GENERAL ELECTRICAL NOTES <br /> u ( INSTALL 8,000 GALLON MODERN WELDING-ENVIRO 16 DOUBLE WALL STEEL TANK WITH VEEDER-ROOT TLS-350 ALARM SYSTEM. <br /> USTREET <br /> I� TANK TO BE SET 60" MINIMUM BELOW FIN. GRD. CONTRACTOR TO FIELD DETERMINE EXACT BURY DEPTH. BACK FILL WITH CLEAN INSULATED FLANGES & KIT OR SHORT SECTION OF PVC CONDUIT TO <br /> WEST LTM JTREE l WASHED SAND. PBE USED ON ENETRATION. ALL UNDERGROUND PIPING & CONDUITS AFTER BUILDING <br /> WEST LL O INSTALL AN 8' REINFORCED CONCRETE TANK SLAB WITH #4 0 12 BOTH WAYS. SET MANHOLE COVERS 3" ABOVE OUTER EDGE ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION OF THE <br /> - -_ - OF SLAB. (SEE TANK SECTION) NATIONAL ELECTRIC CODE. ALL J-BOXES TO BE EXPLOSION PROOF, <br /> 12 AC PAVED PARKING LOT KILLARK #GRSS-2 OR CROUSE-HINDS GUA SERIES. <br /> O ANNULAR SPACE MONITOR. (MANHOLE COVER TO BE LOCKABLE & WATERTIGHT. SEE TANK SECTION) <br /> VCXAT5CT <br /> lwc 1 a 4" FILL RISER. (MANHOLE COVER TO BE WATERTIGHT. SEE TANK SECTION USE CABLE CONNECTOR FITTINGS (GROUSE-HINDS CGB OR <br /> 1l� 1 H BASIN 11 O )' EQUIVALENT) AT MONITOR & LEVEL GAUGE CABLE CONNECTIONS TO <br /> J-BOXES & PIPE FITTINGS IN SUMP BOXES. <br /> � Q5 4" VENT RISER. (MANHOLE COVER TO BE WATERTIGHT. SEE TANK SECTION) <br /> 1 O6 4" ELECTRONIC TANK GAUGE PROBE RISER. (MANHOLE COVER TO BE LOCKABLE AND WATERTIGHT. SEE TANK SECTION) BE PVC DCOATED RIGID. ALL ERGROUND TCONDUTSS AND O INSTALLED INSIDE BUILDING MAYNDUITS INSTALLED OUTDOORS <br /> F" INSTALL TEMPORARY ABOVE(GROUND TANK BE EMT (COMPRESSION TYPE FITTINGS ONLY). <br /> EE ENLARGED AREA PLAN =___� PER DETAIL 4, SHEET P4. I OVEEDER-ROOT #790091-001 OVERFILL ALARM & VEEDER-ROOT #790095-001 OVERFILL ALARM ACKNOWLEDGMENT SWITCH (MUST <br /> I BE PLACED IN VIEW OF FILL). EXACT LOCATION TO BE FIELD DETERMINED. ALARM SHALL ACTIVATE AT 90% TANK CAPACITY. <br /> E% (� - - - 1 18 PROVIDE ELECTRICAL FEED FROM 20 AMP BREAKER IN ELECTRICAL PANEL USING 3/4" CONDUIT. CONTRACTOR TO PROVIDE & INSTALL PULL BOXES AS REQUIRED TO <br /> [�-+ � \ TEMP. 19 FACILITATE WIRE P <br /> I � INSTALL VEEDER-ROOT TLS-350 PLUS TANK MONITORING PANEL, EXACT LOCATION TO DETERMINED IN FIELD. PROVIDE ELECTRICAL ALL EQUIPMENT, HARDWARE AND SYSTEM COMPONENTS MUST BE <br /> 1 FEED FROM (E) 20 AMP BREAKER IN EXISTING ELECTRICAL PANEL. RETURN EXISTING TANK MONITORING PANEL TO STAN INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S <br /> I BRODECKI 0 SBC ENVIRONMENTAL MANAGEMENT (925-823-6151). INSTALLATION OF VEEDER-ROOT EQUIPMENT MUST BE INSTRUCTIONS AND SPECIFICATIONS. <br /> (N) 12" DETAINING PERFORMED BY A STATE LICSENED ELECTRICIAN WITH VEEDER-ROOT CERTIFICATION. <br /> (N) CMU WALL 1 ALL CONDUCTORS TO BE THAN CU. <br /> (N) GONG. WALL, CONSTRUCT WALL (BYI OTHERS) O9 INSTALL 1" SUPPLY AND 1 1/2" RETURN WESTERN FIBLEGLASS FLEXIBLE FUEL LINES, SLOPE 1/4" PER FOOT TOWARD TANK. ALL CONDUITS TO BE MINIMUM 3/4" UNLESS NOTED OTHERWISE. <br /> (BY OTHERS). AFTER ENGINE INSTALLATION <br /> / '�/ I 1 (BY OTHERS) LINE OF1 FOOTING RUN LINES INSIDE (1) 4" WESTERN FIBERGLASS FLEXIBLE SECONDARY PIPE FROM TANK TO WALL PENETRATION AT ENGINE ROOM. <br /> BELOW. (BYI OTHERS) RUN 4" SECONDARY THROUGH 5 9/16" ASTM A53 SON. 40 STEEL CHASE THROUGH AREAWAY BETWEEN UNDERGROUND TANK <br /> 24 Zs - _ - 9 20 AND GENERATOR ROOM IN BASEMENT. SINGLE WALL 1" BLACK STEEL SUPPLY AND 1 1/2" RETURN PIPING FROM WALL r7 <br /> 1:14 U • r� 15 23 9 I 3 r") <br /> PENETRATION TO GENERATOR. ATTACH STEEL CHASE TO AREAWAY WALL USING UNISTRUT PIOOO CHANNEL SEE DETAIL 1, SHEEP HAZARDOUS AREA A ATOrrES <br /> .r- V 11 EA 1V <br /> Z is +<r -I w•.+s 1 14 P4. <br /> - - I 10 RUN (2) #12 AND (1) #12 ONO. FROM ELECTRICAL PANEL TO VEEDER-ROOT OVERFILL ALARM. <br /> 17 21 10I 3 IN AN OUTSIDE LOCATION, ANY AREA WITHIN 5'-0" HORIZONTALLY <br /> STEEL I 11 INSTALL 2" DOUBLE WALL VENT LINE. SLOPE 1/4" PER FOOT DOWN TO TANK. (SEE DETAILS). FROM ANY TIGHT TANK FILL PIPE SHALL BE CLASSIFIED AS A CLASS <br /> 22 SLEEVE 3 I- I -1 1 DIVISION 2 HAZARDOUS AREA. <br /> e 7 16 I ` i o 12 INSTALL NEW VENT RISER. (SEE DETAILS). <br /> ENGINETHES OF ANY <br /> ROOM 25 - 13 CONTRACTOR TO COMPLETE ALL EQUIPMENT TESTS REQUIRED BY GOVERNMENTAL AGENCIES. VENTSPHERIPIPE SHALL BE CLASSIFVOLUMEIIEDAAS CLASS 1 DIVISION I TANK <br /> -- 16 HAZARDOUS AREA AND FROM 3"-0" TO 5'-0" AS CLASS 1 <br /> 14 <br /> ALL MANHOLES AND BOXES TO BE INSTALLED STRAIGHT TRUE, IN-LINE, AND 3" ABOVE OUTER EDGE OF SLAB. 2. <br /> • �- 4 ALL ELECTRICAL CONDUITS, FITTINGS, ETC. IN THESE AREAS SHALL <br /> REMOVE15 i" SCOTCHKOTED BLACK STEEL SUPPLY AND 1 1/2'RETURN FUEL OIL PIPING INSIDE ENGINE ROOM (BY OTHERS). CONFORM TO THE LATEST EDITION OF N.E.C. ARTICLE 514, <br /> EXISTING 5 <br /> 5-0' 6 ELECTRICAL WIRING AND EQUIPMENT BELOW A HAZARDOUS AREA <br /> UMIN. 16 SENSOR CONDUIT & CONDUCTOR RUN. CONTRACTOR TO RUN ONLY (1) BELDEN BELDFOIL #83712 100% SHIELDED CABLE (16 SHALL BE RATED FOR CLASS 1 DIVISION 1. PROVIDE SEAL-OFF <br /> N III PIPING AWG MIN.) WITH 14 CONDUCTORS IN EACH CABLE. CABLE TO CONTAIN 2 CONDUCTORS FOR EACH SENSOR. ALL TANK AND <br /> FITTINGS ON ALL CONDUITS ENTERING OR LEAVING A HAZARDOUS ' <br /> � 0 25 <br /> PIPING SENSORS TO BE INCLUDED IN ONE (1) HOME RUN FROM TANK AREA TO TLS-350 MONITOR PANEL. AREA, <br /> - -- o -- �- -- 1Q CONSTRUCT STEEL FIRE BOX, SEE DETAIL 2, SHEET P4. IMPORTANT NOTICE <br /> C� <br /> -, Section 4216 / 4217 of the <br /> THE FOLLOWING REQUIREMENTS ARE TO BE MET: e 18 CONTRACTOR TO REPLACE ANY A/C PAVING DAMAGED DURING FUELING SYSTEM INSTALLATION WITH NEW 4" PAVING OVER 8" CRE. Government Code requires a Dig Alert <br /> o. 72 HOUR NOTIFICATION PRIOR 70 TANK INSTALLATION. NOTE : LOCAL IMPLEMENTING t9 SLURRY SEAL-COAT ALL NEW A/C PAVING. Identification Number be issued before <br /> a Permit to Excavate will be valid For <br /> b. TANK SYSTEMS TO BE INSPECTED BY CUPA <br /> AGENCIES MAY HAVE ADDITIONAL 90OKWENGINE BASEMENT CONTRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM INSTALLATION WITH NEW CONCRETE TO MATCH EXISTING y <br /> AT (3) THREE SEPARATE CONSTRUCTION PHASES: REQUIREMENTS (BY OTHERS) IN 19 our 9 IN SECTION, SLOPE, COLOR & KIND. Alerta <br /> 1. TANK & PRIMARY PIPING HYDROSTATICALLY OR 1 Underground <br /> PNEUMATICALLY TESTED FOR 30 MINUTES. 2C CONTRACTOR TO LOOSELY WRAP WESTERN FIBERGLASS SECONDARY WITH INSULATED 12 GAUGE COPPER WIRE FROM TANK PIPINGService Alert <br /> SUMP EXIT POINT TO DAYLIGHT AT RETAINING WALL. ATTACH WIRE TO UNISTRUT BOLT AT RETAINING WALL PENETRATION. ATTACH <br /> 2. INSPECTION E ALL SECONDARY CONTAINMENT, PLASTIC SIGN INSCRIBED WITH 1" BLACK LETTERS ON A WHITE BACK-GROUND ON RETAINING WALL. SIGN TO READ "FUEL. PIPE r CALL: TOLL FREE CALL: TOLL FREE <br /> INCLUDING TESTING, IN ACCORDANCE WITH - TRACER". SEE DETAIL 1, SHEET P4. 1-800-422-4133 1-800-642-2444 <br /> MANUFACTURER'S GUIDELINES. AC PAVED PARKING LOT IN SOUTHERN CALIFORNIA IN NORTHERN CALIFORNIA <br /> 3, FINAL INSPECTION, INCLUDING ALL PORTIONS OF77 21 RUN (2) #12 (CONTROLS) FROM VEEDER-ROOT TANK MONITORING PANEL TO VEEDER-ROOT OVERFILL ALARM ACKNOWLEDGMENT Two Working Days Before You Dig <br /> THE LEAK DETECTION SYSTEM. <br /> SWITCH. <br /> c. TANK SYSTEM INTEGRITY TESTS FORWARDED & APPROVED 22 RUN 2 Engineers Note to Contractor. <br /> BY CUPA PRIOR TO TANK SYSTEM Q O #12 AND (2) #12 GND. FROM ELECTRICAL PANEL TO VEEDER-ROOT TANK MONITORING PANEL. <br /> BEING PLACED IN OPERATION. The existence and location of an underground utilities, es, <br /> z3 INSTALL VEEDER-ROOT #794380-208 SUMP SENSOR N FIRE BOX AND AT ENGINE ROAM FLOOR LEVEL SEE DETAILS 1 AND 2 Y 9 pipes, SEp-ARf'h, <br /> d. STATE WATER RESOURCES FORMS (FORMALLY A, B, AND SHEET P4, and/or structures shown on these plans were obtained by a searchfp�,. ""P.. - <br /> C) MUST BE COMPLETED & SUBMITTED PRIOR TO TANK of available records. To the best of our knowledge, there are no <br /> OPERATION. 9FDOWN 2a INSTALL LOCKING RECORDS BOX ON WALL FOR STORAGE OF TLS-350 PRINT-OUTS SEE DETAIL 2 SHEET P5. existing utilities except as shown on these plans. The contractor <br /> shall ascertain the true vertical and horizontal location and size of * ; #C 19 1 <br /> e. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE 25 PROVIDE 3M 31 GALLON PETROLEUM SPILL KITS GRAINGER STOCK # 5F834 (800-994-2343 EXT. 87375). (2) KITS PER SITE. those underground utilities to be used and shall be responsible for <br /> SUBMITTED & APPROVED BY CUPA <br /> any damage to any public or private utilities, shown or not shown SEP 2001 <br /> o PRIOR TO TANK OPERATIONS. hereon. S'•,, p10.0�:�Q. <br /> E L EVIDENCE OF FINANCIAL RESPONSIBILITY SUBMITTED TO <br /> a CUPA. r"OF CAiFo <br /> \ �'?j <br /> e <br /> N <br /> UNDERGROUND TANK REMOVAL PROCEDURE UNDERGROUND PIPING INSTALLATION NOTES REVISIONS / AUFHORIZAIIONS <br /> 1. Contractor shall call U.S.A. and have utilities field marked 12. Shore the edge of the tank hole, if required. All shoring is 19. If excavation is left open overnight, Contractor to completely No. REVISIONS / AUfHORIZATONS DATE BY <br /> $ prior to any excavation. In addition, Contractor shall make to be in place before excavating tank. fence off the tank hole with six (6) foot high temporary chain UNDERGROUND FUEL SYSTEM PIPING <br /> rn• visual and magnetic inspection of work area for any possible link fencing, no exceptions. A lockable gate shall be provided on all SUBMITTED FOR PERMIT 7/17/Dl MED <br /> underground utilities and conduits. Contractor is responsible for 13. Dig down to the top of the tank, excavations left open more than 2 days. See plans for location. INSTALL ALL PIPING PER MANUFACTURER'S INSTALLATION SPECIFICATIONS. CONTRACTOR SHALL AIR PRESSURE TEST ALL PRIMARY & <br /> restoring any underground utilities damaged during construction. SECONDARY PIPING PRIOR TO BACKFILLING OR CONNECTING TO TANKS AND GENERATORS. ISOLATE AND CAP ALL PRIMA PIPING RUNS 1 CHANCE UNDERGROUND PIPING SPECIFICATION 9/29/01 MED <br /> • 14. Remove the fill (drop) tube and TLS probe. Disconnect the 20. Upon approval of SBC Facility Engineer and SBC Environmental & PRESSURIZE TO 75 P.S.I. (MIN.) FOR 30 MINUTES (MIN.), OR LONGER AS REQUIRED BY LOCAL AGENCY. SOAP TEST ALL JOINTS AND <br /> a 2. Notify SBC Facilities Engineer,Ston Brodecki, Site fill, gauge, and product and vent lines. Cap or plug open Manager, Contractor shall install new tank. INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED AS REQUIRED. SECONDARY PIPING TO BE AIR TESTED AFTER CONNECTION IN <br /> Contact,Kathy Hallinan and U.S.A. forty-eight (48) hours prior to ends of the lines which are not to be used further. Remove any CONTAINMENT SUMP AND IN BUILDING PIPE TRENCH AT 3 P.S.I. (MIN.) TO 5 P.S.I. (MAX.) FOR 30 MINUTES (MIN.), OR LONGER AS <br /> o start of tank removal or any excavation. remaining liquid from the delivery line using care to avoid 21. Replace or restore any existing site condition damaged or REQUIRED BY LOCAL AGENCY. SOAP TEST ALL CONNECTIONS AND JOINTS AND INSPECT FOR LEAKS REPAIR ANY LEAKS DISCOVERED AS <br /> d spillage. altered during the tank removal and installation, remove sheet REQUIRED. MAINTAIN THE AIR TEST ON THE SECONDARY CONTAINMENT PIPING DURING THE BACKFILLING PROCESS AND VERIFY THAT NO PROPRIETARY SBC INFORMATION <br /> 3. Close air conditioning inlets subject to fumes prior to work. piling. PRESSURE DROP OCCURRED IN THE SECONDARY PIPING. INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED. AFTER BACKRLLING NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> 15. Plug all tank openings with one plug to have 1/8 inch vent PIPING RUNS, BOTH PRIMARY AND SECONDARY PIPING SYSTEMS TO BE RETESTED PER AFOREMENTIONED PROCEDURES. THE TESTING OF ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN <br /> 4. Fuel in existing underground tank shall be removed and disposed hold for temperature expansion. 22. ALI water and soil tests shall have results submitted to the THE PRIMARY AND SECONDARY PIPING MUST BE WITNESSED BY ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. AFTER THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> of by SBC Contractor. Contractor shall furnish fuel disposal environmental management department of SBC within 24 hours SUCCESSFUL COMPLETION OF PIPING TEST, CONTRACTOR TO PULL BACK REDUCING BOOT FROM SECONDARY PIPING IN TANK SUMP TO ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> $ documentation to SBC. 1.6. The tank shall be made inert by using thirty pounds of dry after the samples are taken. ALLOW UNRESTRICTED DRAINAGE FROM SECONDARY PIPING SYSTEM INTO THE CONSTANTLY MONITORED TANK SUMP. <br /> GOVERNMENTR SAND AUTHOR(ATIONSN FOR BUECTION ILDINGS,ITH APPLICATION FOR <br /> E ice per thousand gallons of tank capacity or as required AND OR ZONING CHANGES. <br /> in 5. RHL Design Group will apply for tank removal permit. Contactor by local authorities. TANK SUMP HYDROSTATIC TEST DRAWINGS PREPARED FOR <br /> is responsible for picking up permit, paying fees, and arranging <br /> oq inspections. All tank and piping removal is by Contractor. 17. After tank has been inspected by local health and fire ALL NEWLY INSTALLED TANKS AND TANKS RETROFITTED WITH NEW SUMPS OR NEW HARDWARE THAT ENTERS OR EXITS A SUMP ARE TO <br /> N Contractor shall cooperate with "Environmental Contractor" for inspectors, excavate and remove tank and piping. Contractor to BE HYDROSTATIC ALLY TESTED WITH A HEAD OF WATER ONE FOOT ABOVE THE HIGHEST POINT OF PENETRATION OR JOIN. ENVIRONMENTAL MANAGEMENT <br /> soil/water sampling and disposal of tank. load tank and piping on transport provided by others. Disposal <br /> of tank and piping by Enviro. Contractor. Contractor to remove PACIFIC REGION <br /> 0 6. Provide fire extinguishers of size and rating specified by and dispose of existing concrete tie-down slab beneath tank if ENGINE ROOM PIPING NOTES PIPING AND CONDUIT LEGEND <br /> i°. local fire departments. specified in Scope of Work on sheet P-1. PROJECT TIIIE: <br /> FUEL SUPPLY & RETURN PIPING TO BE SCH. 40 ASTM PACIFIC BELL FACILITY <br /> E - - - - - - - TANK MONITORING SYSTEM CONDUITS <br /> 7. There shall be no welding or other sources of ignition in the 18. After the existing tank Is removed, soil and/or water samples A-53 BLACK STEEL. <br /> area while the removal operations are in progress. There shall will be taken from the tank hole by the Environmental 124 W. ELM STREET <br /> N be no smoking on the job site. "NO SMOKING" signs shall be Contractor. If the soil/water samples are clean, then soil THREADED FITTINGS TO BE 150# MALLEABLE IRON. 4" FLEXIBLE SECONDARY WITH FLEXIBLE 1" SUPPLY AND 1 1/2" <br /> posted. shall be disposed of by Contractor. If contamination is RETURN PRIMARY PIPES INSIDE. <br /> ii discovered, Contractor to notify SBC Environtmental Manager WELDED FITTINGS TO BE 3000# FORGED STEEL SOCKET 1 LODI, CALIFORNIA <br /> 0 B. Provide barricades with flashing yellow lights and warning Immediately, Contaminated soil is to be stacked separately WELD. '---------------- 3" FRP WITH 2" STEEL VENT PIPING INSIDE <br /> signs to protect pedestrians and/or motor vehicles from on visqueen and covered with visqueen and anchored firmly to Lq <br /> LODICA01 UE020 <br /> oma+ - work area and tank hole. prevent it from being blown off. Provide an asphalt, concrete or PIPE FLANGES TO BE 150# RAISED FACE THREADED OR SHEET TIRE: <br /> o sandbag berm around all dirt stack piles to prevent runoff. SLIP-ON AS REQUIRED. INSTALL WITH 1/16" THICK STAND-BY GENERATOR SUCTION SYSTEM <br /> �,69. Drain, and when appropriate, flush product in the piping into the Disposal of contaminated soil will be under separate contract. RING GASKETS AND FLANGE BOLT & NUT SETS. SITE PLAN TANK REMOVAL, & INSTALLATION <br /> O tank. Disposal of contaminated soil will be by Environmental <br /> p1 z Contractor. Contractor shall load contaminated soil on truck <br /> D PIPE WELDING TO BE PERFORMED BY CERTIFIED NOTES <br /> w ' 10. The Rinse Contractor shall remove all remaining flammable liquid provided by Environmental Contractor. WELDERS. ESTIMATE/ ROUTINE ORDER: <br /> c3 from the tank which can be pumped out. It may be necessary 5/25/011 SCALE: AS NOTED <br /> I to use a hand pump to remove the bottom few inches of COAT STEEL PIPING WITH SCOTCH KOTE 206N. DRAWN III SIT'N CHECKED BY: MED <br /> product and rinsate. All residual liquid or sludge, including SBC AUTHORIZATION: <br /> SHEET: 2 OR 8 sxLETs SHEET NO. <br /> rinstate will be disposed of by Environmental Contractor. REPAIR ANY NICKS OR SCRATCHES WITH SCOTCH KOTE ARCHITECI'ORB • ENGMEEMIG • RNYIRONOUAL SBRYICES <br /> 312, rfRJHL 1131 N. MCDOWELL BLVD. PETALUMA. CA 94954 (707) 765-1660 SBC DRAWING NO.: Q <br /> 11. Sawcut and remove concrete or A.C. cover for access to OWN Dr- JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVILENGINEERPL <br /> tank dis ose of concrete and A.C. debris. <br />