My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 1:00:14 PM
Creation date
11/5/2018 9:19:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\INSTALL 2002.PDF
QuestysFileName
INSTALL 2002
QuestysRecordDate
7/5/2017 9:39:11 PM
QuestysRecordID
3482255
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/27/2002 12:57 FAX 425 251 8782 BARGHAUSEN Z006 <br /> ForFX2VmodeaS . If flow is restricted to about 3 gpm <br /> a. Remove 114-inch pipe plug from tank test port In (I l fpm)or less with the nozzle open,the <br /> the Packer (on 6-inch Big-Flo applications, re- leak detector has not opened.Repeat step <br /> move the 1/4-inch pipe plug from the riser/flange 8a with increased running time of pump <br /> to insure the purging of ill air. All air <br /> assernl>ly). <br /> purged from the system or the <br /> b. Apply a UL-classified non-toxic pipe thread seal- must <br /> ant to the 1/4-inch NPT 45-degree elbow and leak detector will restrict flow to about 3 <br /> gpm(11 Ipm). <br /> install in tank test port of the packer. On 6-inch <br /> Sig-Flo applications,the 1/4-inch NPT 45-degree 9. Affix the enclosed decals to the dispenser dial glass on <br /> elbow may be installed into the riser/flange as- grade of gasoline upon which the leak detector is <br /> sembly. being installed. Additional decals are available;call <br /> c_ Apply UL-classlfled non-toxic pipe thread seal- customerservireat 1-800-952-8348or(913)498-5700- <br /> ant to the 1/4-inch NPT hex nipple and install on 10• Inspect all threaded joints to assure they are tight and <br /> 45-degree elbow that is in the tank test port(or nn not leaking. <br /> 6 inch Big-Flo riser/flange assembly, <br /> d. Apply a UL-classified non-toxic pipe thread seal- Test of the Leak Detector <br /> ant to the 114-inch NPT tee and install on the hex <br /> U S Environmental Protection Agency(IPA) regulations re- <br /> nipple <br /> to accommodate both the vent tube and <br /> the snap tap. quire annual verification of operation of leak detector- To <br /> e. Apply a UL-cl issifled non-toxic pipe thread seal- assure maintenance of leak detection capability,Red Jacket <br /> ant to the threads of the 1/4-inch NPT 90-degree requires that operation of the mechanical leak detector be <br /> elbow vent tube fitting and install in the tee. verified by testing upon start-up and that testing of the leak <br /> L Apply a UL-classified non-toxic pipe thread seal- detector be performed routinely at least annually. <br /> ant to the threads of the 1/4-Lech NPT straight <br /> vent tube fitting and install in the leak detector leak Test procedure options for mechanical <br /> vent opening in the cap of the leak detector- Engineering tectors are <br /> andR JZI.inRed cet <br /> Install the vent tubdn into both fittings and Red Jacket <br /> Reports, Co and ors a The <br /> $- g 5 Red Jacket Snap Tap Connectors allow <br /> tighten_ the FX2VlFX2DV leak detector to be tested <br /> li. To Install snap tap connectors In FX2V/FX2DV with the FXV Snap Tap Tester as an op- <br /> models, apply a UL-classified non-toxic pipe tion to the above test methods. See Red <br /> thread sealant to the snap tap connectors and Jacket literature #042-111-1 for test in- <br /> install one in the body of the FXV leak detector 9tructious using Snap Tap Connectors. <br /> and the other in the tee attached to the hex nipple <br /> attached to the 45-degree elbow installed in the 11. The top cover on the Red Jacket leak detector is <br /> tank test port of the packer. On Cinch I32g-Flo designed to accommodate a sealing wire which can be <br /> applications,install the twa snap tap connectors used to discourage tampering or the unauthorized <br /> -one In the body of the FXV leak detector and one removal of leak detector.(,See Figure 2). <br /> in the riser/flange assembly. <br /> i. Attach and crimp loop of the retaining tether • It should be noted that if the dispensing <br /> around the Snap Tap threads. system(the salenoidvalveandthenozzle} <br /> j. Replace the caps over the quick-connect cou- is opened previous to the completion of <br /> the line test, <br /> lSeries <br /> plings and tighten snugly. this opening asa leak and restricted ted flow <br /> DO NOT overtighten. will result_ Closing of the nozzle(s)for a <br /> period oftime adequate to allow comple- <br /> See technical bulletin 4042.111-1 for use tion of the line test will allow the leak <br /> of Snap Tap Connector Assembly. detector to open.Once opened,full pump <br /> flow can be prwlded- <br /> 7 Connect power to pump at the load center. <br /> &. Clear remaining air from system as follows' <br /> a. Turn on dispenser that is farthest from the leak FX2V/FX2DV— TETHERED <br /> detector but do not open nozzle.Wait 4 or 5 CAP <br /> minutes or more. Look for leaks on parts <br /> workedon- <br /> v <br /> b. Shut off the pump and allow it to stand four or SNAP TAP <br /> 45'ELBOW <br /> five minutes. Then start the pump again and - <br /> open the nozzle farthest from the leak detector. <br /> e. Continue to dispense enough gasoline,about 20 <br /> to 30 galions(76 to 114 liters),to pump ALL air <br /> from the system. Figure 1 r <br /> m <br /> SEALING WIRE iI�-i 1I4-INCH <br /> F01 Marley Pump (provided by contractor) 9a L_f� T- -INC G <br /> a urMtcd do�Yn;on tm�m�vy <br /> 7401 W.129 Sl.-Overland Park.KS 66213-913-498-5700 <br /> Marley Pump reserves the right to make design Improwmenls and VENT TUBE <br /> pricing mod"Ications as necessary and wEthout notice. Fl ure 2 <br /> t51 e94 Marley Pump Printcd In LISA g <br />
The URL can be used to link to this page
Your browser does not support the video tag.