My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 1:00:14 PM
Creation date
11/5/2018 9:19:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\INSTALL 2002.PDF
QuestysFileName
INSTALL 2002
QuestysRecordDate
7/5/2017 9:39:11 PM
QuestysRecordID
3482255
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Containment • <br /> Optional tank accessories for secondary containment systems, <br /> Fiberglass Secondary Containment Collar <br /> An optional secondary containment collar provides a containment area <br /> 1.0 for spilled liquids, as well as a location for the leak-monitoring sensor. <br /> Collars can be installed around other tank fittings and accessories, <br /> 75 where space permits. Collars are constructed of fiberglass and are <br /> available in 42'diameter(with 22"manways)and 48"diameter(with 22" E <br /> and 30" manways) sizes. <br /> The secondary containment collar is integrally attached to the tank top <br /> to provide a watertight seal. The collar is factory installed and tested <br /> prior to shipment. Another collar leak test should be performed at the <br /> jobsite by the installing contractor. See CSI installation instructions for details. The secondary containment <br /> collar must periodically be tested for leaks—at least once each year or after collar maintenance is performed <br /> — by adding water to the collar above the tank top. The secondary containment collar must be continuously <br /> � x <br /> monitored with an electronic sensor for potential spills or piping leaks. <br /> Q Secondary Containment Fitting <br /> A 6" FRP threaded secondary coupling is concentrically positioned <br /> around the 4" NPT primary tank fitting. The secondary containment <br /> coupling is surface-mounted onto the tank and does not penetrate the <br /> outer wall. There is no access to the tank annular space at the 6" <br /> secondary containment coupling. To directly monitor the cavity <br /> between the primary and secondary pipe, a fitting with an access port <br /> should be installed. <br /> I <br /> .4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.