My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
4201
>
2300 - Underground Storage Tank Program
>
PR0516300
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 2:39:35 PM
Creation date
11/5/2018 10:12:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516300
PE
2381
FACILITY_ID
FA0001198
FACILITY_NAME
TURNER STATION
STREET_NUMBER
4201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20103019
CURRENT_STATUS
02
SITE_LOCATION
4201 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\4201\PR0516300\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Changes in the haza'r� assessment, considering Z l the above variables, <br /> shall be brought to the Contractor's attention. <br /> Changes in engineering controls, work practices or PPE shall be <br /> communicated to the contractor employees immediately. <br /> Workers shall be notified either through the safety meetings or site <br /> specific training by the CIH at whatever frequency is necessary to <br /> ensure the safe and efficient completion of the project. These meetings <br /> shall take place not less than once per week. <br /> 2. Upgrade or downgrade in level of personal protective equipment. <br /> Changes in ppe requirements shall be based on the factors listed above <br /> and monitoring results. The SSM/CIH shall maintain constant vigilence <br /> and implement changes up or down as necessary to protect the workers. <br /> 3. Work stoppage and/or emergency evacuation of onsite personnel. <br /> If any of the following criteria or conditions exist, the workers shall <br /> be notified by the emergency horn signal (three short blasts) to <br /> evacuate immediately to the Command Post (Work Office Trailer) . <br /> a . Work Stoppage <br /> • Exceeding the PEL of any Chemical. <br /> • Any serious injury requiring major medical attention. <br /> • Any report of suspected contaminant-related illness. <br /> • Any emergency requiring evacuation. <br /> • At the SSM discretion. <br /> 30 <br /> Site Safety 6 Health Plan Rev. /1. 0 <br /> October 20, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.