My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIANCHI
>
4
>
2300 - Underground Storage Tank Program
>
PR0505060
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:54 AM
Creation date
11/5/2018 12:10:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0505060
PE
2381
FACILITY_ID
FA0010636
FACILITY_NAME
STKN MUD WW
STREET_NUMBER
4
Direction
W
STREET_NAME
BIANCHI
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
10231004
CURRENT_STATUS
02
SITE_LOCATION
4 W BIANCHI RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BIANCHI\4\PR0505060\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAJESTIC TECHNOLOGIES, INC. <br /> 6.0 ORGANIZATION <br /> 6. 1 GENERAL <br /> Based on the scope of work and the project work plan ( see Section 7 . 0 ) , <br /> no to utilize a three-Person work team to <br /> Majestic Technologies . Inc. pla <br /> The field work team shall consist of the <br /> perform all field operations. <br /> us Materials Technicians. Because of the <br /> Project Manager and two Hazardo <br /> small size of the field work team. a simple organizational structure is <br /> applicable. The Project Manager shall therefore also function as both <br /> the Field Supervisor and the Safety and Health Officer ( see Section 1- 0) . <br /> 6. 2 RESPONSIBILITIES <br /> 6. 2 . 1 PROJECT MANAGER <br /> The Project Manager shall represent Ma�estie Technologies. Inc. in all <br /> aspects of its work under the project contract , and shall be responsible <br /> for the followinV <br /> - Coordination of all work performed by the contractor and its <br /> subcontractors for the Project- <br /> - Serving as the lieson with Orange County General services <br /> Agency. Orange County Fire Department , and other designated <br /> agencies. <br /> - Ensuring that the safety and Health Plan (SHP) is approved <br /> by the orange County General Services Agency prior to <br /> commencement of operations. <br /> - Ensuring that all employees and subcontractors assigned to <br /> the project have been informed of, and trained in. the <br /> content of the SHP. <br /> - Ensuring that required personal protective equipment, air <br /> monitoring instruments. and other safety- related items are <br /> provided and properly utilized for the project. <br /> - Ensuring that all field personnel , including any <br /> subcontractor personnel , assigned to the project have <br /> satisfied all requirements for training and medical <br /> survelliance as specified by 29 CFR 1910. 120, and that <br /> records of training and medical approval are available and <br /> maintained for each person. <br /> Ensuring that all personnel assigned to the protect have <br /> been instructed onthe work plan, operations to be performed, <br /> known and potential hazards associated with the work, SHP <br /> requirements, proper use of required personal protective <br /> equipment , specified safe work <br />
The URL can be used to link to this page
Your browser does not support the video tag.