My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:14:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2012-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® lndustry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑Other(Specify} <br /> Test Equipment Used:PRESSURE GAUGE Equipment Resolution:0.5 PSI <br /> Piping Run#87 Piping Run#89 Piping Run#91 Piping Run# <br /> Piping Material: FG FG FG <br /> - -- <br /> - ------- - .-.-...--- <br /> Piping Manufacturer: RED THREAD RED THREAD RED THREAD <br /> — ...................... <br /> Piping Diameter: 3" 3" 3" <br /> tof Piping ----- <br /> g Run: 300' 300' 300' <br /> -Length— ------ <br /> Product Stored: 87 89 91 <br /> Method and location of ISO BOOT ISO BOOT ISO BOOT <br /> piping-run isolation: <br /> Watt time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN <br /> starting test: <br /> Test Start Time: 12:30 12:30 12:30 <br /> Initial Reading(RC): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1:30 1:30 1:30 _ <br /> Final Reading(Rr): 5 PSI 5 PSI 5 PSI <br /> Test Duration: IHR IHR ] FIR <br /> Change in Reading(R,-Ro: 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> 03 2zo F .;:" n'W Pass ElFail ❑ Pass .o Fail <br /> Comments- (include information on repairs made prior to testing„ ondrecommendedfoflow-upforfailed tests) <br /> NOV 2 5 2014 <br /> ENVIRONMENTAL <br /> HEALTH DERART.MENT <br /> Secondary Containment Test Results 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.