My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:14:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2012-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> 'fest Method Used: ❑Pressure ❑ vacuum ❑ Hydrostatic <br /> ❑ Other(.Specify) __. ' <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0001 r <br /> UDC# UDC# UDC# UDC <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to'fop <br /> o_f_Hi est Pi in Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tcsted <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑Ym❑No❑NA ❑Yes❑No❑NA ❑ Yes❑No❑NA ❑Yes❑No❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test <br /> Test Stag Time: <br /> Initial Reading Rt): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 15 MIN I S MIN 15 MIN 15 MIN <br /> Change in Readin a(R,-R,): ---- ----_ <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Teat Rvlt Pa§s ' Fail —Pass w❑Fail Pass : Fail Lj Pass Fail. <br /> Wassensor removed for testing? ❑Yes No NA Yes No NA Yes No 0 NA Y;stj No 0NA <br /> W as sensor properly replaced and ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> verified functional atter testing? <br /> Comments— (includ(information opt repairs made prior to lesling, and recommended follow-up forf riled tests) <br /> ALL UDC TESTING IS SCHEDULED FOR 12/3/14. r' <br /> RtGEI Y EC <br /> NOV 2 5 2014 <br /> ENVIRONMENTAL <br /> HEALTH DEPARTRAENT <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 5 of.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.