My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 4:34:37 PM
Creation date
11/7/2018 9:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2011-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />S W RCB, January 2002 <br />• Page _ of <br />7. UNDER -DISPENSER CONTAINMENT (UDQ TESTING <br />Test Method Developed By: 0 UDC Manufacturer 0 Industry Standard X Professional Engineer <br />D Other (Spec) <br />Test Method Used: D Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specie) <br />Test Equipment Used: Caldwell Level Change Indicator <br />UDC # 9&10 -RT UDC # 1&2 -CL <br />UDC Manufacturer: Bravo Bravo <br />Equipment Resolution: .002 <br />UDC # 3&4 -CL <br />Bravo <br />UDC # 5&6 -CL <br />Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />10" <br />9" <br />9" <br />9" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dr; <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Level 8" <br />Water Level 7" <br />Water Level 7" <br />Water Level 7" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />Yes XNo DNA <br />Yes XNo DNA <br />Yes XNo DNA <br />Yes XNo DNA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />X Yes 0 No 0 NA <br />X Yes ONO DNA <br />X Yes ONO DNA <br />X Yes ONO DNA <br />Was fail-safe verified to be <br />operational?* <br />❑Yes XNo 0 N <br />OYes XNo DNA <br />❑Yes XNo DNA <br />❑Yes XNo DNA <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />11:55 <br />10:00 <br />10:05 <br />10:10 <br />Initial Reading Rr): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />12:25 <br />10:30 <br />10:35 <br />10:40 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading RF-Rr: <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />st` <br />sa.' <br />, <br />p <br />'pailTeifl <br />Was sensor removed for testing? <br />X Yes 0 No 0 NA <br />X Yes 0 No 0 NA <br />X Yes ONO DNA <br />X Yes ONO DNA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes 0 No 0 NA <br />X Yes ONO DNA <br />X Yes ONO DNA <br />X Yes ONO DNA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Penetrations enter from of Bravo System UDC's. <br />RT=Retail Island/CL=Card Lock Island <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to Ally of the questions indicated with an <br />rterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.