Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 14 - Electrical Work <br /> provide a fully operable and acceptable system. Extras <br /> will not be allowed for work not indicated or noted on <br /> the Drawings , and / or required in Specifications when <br /> such work is apparent from an inspection of the premises <br /> at that time . <br /> 14. 8 Power Interruptions : <br /> 14 . 8 . 1 The facility will be in operation during construction. <br /> 14 . 8 . 2 Electrical circuits shall be interrupted only with prior <br /> written consent . Such interruptions shall be preceded <br /> by all possible preparations by the Contractor which are <br /> necessary to keep the Electrical circuit off for a <br /> minimum period in an expeditious manner pursuant with <br /> good workmanship . If required , this work shall be done <br /> on weekends with no added expense to P .G . & E . <br /> 14. 8 . 3 Written requests for outages shall be submitted seven <br /> ( 7 ) calendar days in advance of the outage date . This <br /> request will delineate the particular circuits in <br /> question, the time of day the power should be removed , <br /> and an approximate number of hours the power shall be <br /> off . <br /> 14. 8 . 4 .All work on service conductors and other such equipment <br /> shall be done only when such conductors and equipment <br /> are deenergized . The foreman of the work must <br /> disconnect the voltage from these circuits himself , <br /> install his own padlock and keep the key . In addition , <br /> a safety warning tag shall be affixed to the switch . <br /> This tag shall describe the work being done and the <br /> location of the job . The padlock shall be removed at <br /> the earliest possible moment after the line has been <br /> cleared of all personnel . <br /> 14. 9 Demolition : <br /> 14.9 . 1 Under this section , the Contractor before submitting his <br /> bid , shall visit the site , review the existing Drawings <br /> and allow for all demolition that is necessary for <br /> complete installation of new electrical work. <br /> 14. 9 . 2 Remove all abandoned wiring , electrical equipment and <br /> fixtures . Such items will either be stored at <br /> XIV-4 <br />