My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO 2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:22 PM
Creation date
11/7/2018 5:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2014-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 19 2014 <br />SWRCB, January 2002 Page _ of <br />5 SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ ProfeOEMMENT <br />❑ Other (Specify) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 120' <br />Approx. 130' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #2 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:45 <br />9:35 <br />Initial Reading (Rj): <br />3 Psi <br />3 Psi <br />Test End Time: <br />10:45 <br />10:35 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.