My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVED <br /> JAN 0 3 2017 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer E Industry Standard ❑.P�fasf MINTAL HEA H <br /> 11 Other(specify) tt V I <br /> Test Method Used: ❑Pressure ❑Vacuum E Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment_Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> STP Sump#87 STP Sump#89 STP Sump#91 STP Sump#Diesel <br /> Sump Diameter. 42" 42" 42" 42" <br /> Sump Depth: 66" 67" 66" 66" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 18" 19" 18" 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6" 6" 6" 6" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good Good <br /> Portion of Sump Tested' 2"above piping 2"above piping 2"above piping 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No E NA ❑Yes❑No E NA ❑Yes❑No E NA ❑Yes❑No E NA <br /> product end water)? 11 <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe <br /> shutdown? ❑ Yes[INo E NA ElYes❑No E NA ❑Yes❑No ENA ❑Yes❑No ENA <br /> Was fail-safe <br /> operational?. to be <br /> o erational? ❑ yes❑No ENA ❑Yes❑No ENA ❑Yes❑No ENA ❑Yes❑No ENA <br /> Wait time between applying <br /> pressure/vacuutn/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 8:47 am 8:47 am 3:31 pm 9:05 am <br /> Initial Reading(Ri): 7.0128 7.1484 5.6918 6.9733 <br /> Test End Time: 9:02 am 9:02 am 3:46 pm 9:21 am <br /> Final Reading(RF): 7.0131 7.1491 5.6919 6.9744 <br /> Test Duration: 15 min. 15 min. 15 min. 16 min. <br /> Change in Reading(R,,-Ri): 0.0003 0.0007 0.0001 0.0011 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +1-0.00211 +/-0.002" <br /> Test Result: ® Pass ❑ Fall ® Pass ❑ Fall ® Pass ❑ Fall ® Pass ❑ Fail <br /> Was sensor removed for testing? E Yes❑No ❑NA E Yes❑No ❑NA E Yes❑No ❑NA E Yes❑No❑NA <br /> Was sensor properly replaced and <br /> verified functional atter testing? E Yes❑No ElNA E Yes❑No❑NA E Yes❑No ❑NA E Yes❑No❑NA <br /> Coinments—(include infoiwiation on repairs made prior to testing, and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Replaced Test Boot in 91 STP, re-tested, passed. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.