My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVED <br /> JAN 0 3 2017 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer N Industry Standard ❑ FEAVIRO LTH <br /> ❑ Other(Spectfy) DEPARTMENT <br /> Test Method Used: ❑ Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC_#9/10 UDC#11/12 <br /> UDC Manufacturer: Environ Environ <br /> UDC Material: Plastic Plastic <br /> UDC Depth: 31" 31" <br /> Height from UDC Bottom to Top 7„ 7„ <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good <br /> testing: <br /> Portion of UDC Tested 2"above piping 2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> product and water)? <br /> ater?� <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- <br /> safe shutdown? ❑yea❑No ®NA ❑Yas❑No ®NA <br /> Was fail-safe verified to be <br /> operational?' ❑Yea❑No ®NA [__IYes[INo ®NA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 2:07 pra <br /> Initial Reading(R,): 2.8474 <br /> Test End Time: 2:22 pm <br /> Final Reading(RP): 2.8487 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-R,): 0.0013 <br /> Pass/Fail Threshold or Criteria: +/-0.002" <br /> Test Result: ® Pass ❑Fail ❑ Paas ®Fall <br /> Was sensor removed for testing? ®Yes❑No❑NA ❑Yes® No❑NA <br /> Was sensor properly replaced and ®yes❑No❑NA ❑Yes❑No❑NA <br /> verified functional after testin T <br /> _Comments—(include information on repairs made prior to testing and recommended follow-up for ailed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Visual failures to UDC 11/12. <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.