My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB, January 2002 Page 3 of—7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Spec) <br /> Test Method Used: .0--fressure 0 V�,tmm - C Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used: stn VJ_ #- yp rVI Equipment Resolution: <br /> ` Pim Run# I Pim Run# . <br /> Piping _ Piping Z piping Run# Piping Run# <br /> Piping Material: F/ .v 77f s 45�1 -v ,�rij5 <br /> Piping Manufacturer: ut 4/ p"–/ yay, <br /> Piping Diameter: 3 r 311 ' <br /> Length of Piping Run: J XJX, 31 rUX. 3L <br /> Product Stored: 0 l rs c t_ <br /> Method and location of j�S"(' of f'r'}– - S ) <br /> i in -run isolation: . Kr ,s' #.Z <br /> Wait time between applying <br /> essur uum/water and <br /> s test: SaSer-i ;Ku J,5 <br /> Test Start Time: l2 '. 2-� l Z_ L> <br /> Initial Reading(R,): s ns7 �psT <br /> Test End Time: I -2- <br /> Final <br /> 2Final Reading(RF): S SS <br /> Test Duration: o U u <br /> Change in Reading(RF-RJ: $S 4) 15:r- <br /> Pass/Fail <br /> Pass/Fail Threshold or <br /> Criteria: U Lo5St" P5-17 No Loss "a4 <br /> Test Result: I X Pass U Fail Zpass U Fail V U Pass U Fail U Pass U Fail <br /> Comments–(include information on repairs made prior to testing and recommendedfollow upfor ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.