Laserfiche WebLink
S WRCB, January 2002 Page 3 of—7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Spec) <br /> Test Method Used: .0--fressure 0 V�,tmm - C Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used: stn VJ_ #- yp rVI Equipment Resolution: <br /> ` Pim Run# I Pim Run# . <br /> Piping _ Piping Z piping Run# Piping Run# <br /> Piping Material: F/ .v 77f s 45�1 -v ,�rij5 <br /> Piping Manufacturer: ut 4/ p"–/ yay, <br /> Piping Diameter: 3 r 311 ' <br /> Length of Piping Run: J XJX, 31 rUX. 3L <br /> Product Stored: 0 l rs c t_ <br /> Method and location of j�S"(' of f'r'}– - S ) <br /> i in -run isolation: . Kr ,s' #.Z <br /> Wait time between applying <br /> essur uum/water and <br /> s test: SaSer-i ;Ku J,5 <br /> Test Start Time: l2 '. 2-� l Z_ L> <br /> Initial Reading(R,): s ns7 �psT <br /> Test End Time: I -2- <br /> Final <br /> 2Final Reading(RF): S SS <br /> Test Duration: o U u <br /> Change in Reading(RF-RJ: $S 4) 15:r- <br /> Pass/Fail <br /> Pass/Fail Threshold or <br /> Criteria: U Lo5St" P5-17 No Loss "a4 <br /> Test Result: I X Pass U Fail Zpass U Fail V U Pass U Fail U Pass U Fail <br /> Comments–(include information on repairs made prior to testing and recommendedfollow upfor ailed tests) <br />