Laserfiche WebLink
S WRCB, January 2002 Page 4 of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standardofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure - ❑Vacpjn ydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: (!y' /G1,,.Je(jLo!-­e :!:;iie& Y Equipment Resolution: , oo Z,j <br /> Sump# L Sump# Z. Sump# Sump <br /> Sump Diameter: N2 11 oelee 10N 44 1"94 <br /> Sump Depth: 3S It 6 r <br /> Sump Material: G <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest n t t <br /> Electrical Penetration: jj 8 rr <br /> Condition of sump prior to testing: fJ/ #fir <br /> Portion of Sump Tested' uJ4 fry[ry q / rr G+rg te✓(,i1aQ. 17 <br /> Does= shut down when <br /> sump sensor detects liquid(both Yes ❑No ❑NA �gJi es ❑No ❑NA ❑Y ❑ o ❑NA ❑Yes No ❑NA <br /> roduct and water)?� /\ <br /> Turbine shutdown response time of flu cls <br /> Is system programmed for fail-safe <br /> shutdown?n? <br /> ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑ ❑NA <br /> Was fail-safe verified to be <br /> orational?* ❑Yes ;ffNo ❑NA ❑Yes �No ❑NA ❑Yes No ❑NA ❑Yes ❑ ❑NA <br /> Wait time betweee mg <br /> pressure/vacu ater d starting <br /> test <br /> Test Start Time: 1 j /2 : 2-6 <br /> Initial Reading(RO: �IY1>< Crit rYS �Cw4 <br /> Test End Time: l Z' /) Y: S-D <br /> Final Reading(RF): /Ch f CrYc(p �r�f �r+GlO <br /> Test Duration: OT l d2u hrS o r /.K r!f+S <br /> Change in Reading(RF-Rt): t/O G(r o G <br /> Pass/Fail Threshold or Criteria: oar jprAr� o d S" p r�r� <br /> Test Result: Pass ❑Fail ass ❑Fail ❑ Pass ❑ all ❑ ass ❑F it <br /> Was sensor removed for testing? es 0 No ❑NA es ❑No ❑NA Yes ❑No ❑ ❑ es ❑No ❑ A <br /> Was sensor properly replaced and <br /> verified functional after tes[in ? Yes ❑No ❑NA XYes ❑No ❑NA ❑Yes ❑No ❑ gYes ❑No ❑N� <br /> _Comments—(include information on repairs made prior to testing, and recommended ollow ap or ailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />