Laserfiche WebLink
S WRCB,January 2002 Page 5- of 1 <br /> 7. UNArg-DISPENSER CONTAINMENT C~TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ,ofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacu w ''-J�ydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: <cc of Equipment Resolution: , UO L 1 <br /> UDC#L ` Z UDC# 3 £ UDC# UDC# t <br /> UDC Manufacturer: 7T7-7— <br /> UDC <br /> T7TUDC Material: f d / ` d /t <br /> UDC Depth: <br /> 33'� ' <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: / '' / 0 //Z ' <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: j <br /> Condition of UDC prior to <br /> testing: 0V LA Dry <br /> Portion of UDC Tested W q I v, b o_c 12' w 44 r r L—r"—I Z' <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes ❑No ❑NA Aja Yes ❑No ❑NA ❑ es ❑ ❑NA ❑Y ❑ o ❑NA <br /> productand water?� ^ /� <br /> Turbine shutdown response time w r !t..e o.d. <br /> Is system programmed for fail- <br /> safe shutdown?o Yes ❑No ❑NA XYes ❑No ❑NA ❑Y No ❑NA ❑Yes No ❑NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yes )3No 13NA ❑Yes�No ❑NA ❑Y ❑No ❑NA ❑Yes No ElNA <br /> Wait time between applying <br /> pressure/vacuwate and <br /> startingtest 'o/—/r a---iS ld <br /> Test Start Time: /z: 10 Z a <br /> Initial Reading(R): i Gri-i4 t J-F L,vc <br /> Test End Time: 12 ' life) 12 r SS <br /> Final Reading(RF): n-s-F C'm-c 1,0 /oi- <br /> Test Duration: 3 r/0"A 4 <br /> Chane in Reading(R,-R,): o <br /> Pass/Fail Threshold or Criteria: rOoy 3p r,rH . <br /> Test Result: Pass ❑Fail U'Pass ❑Fail ❑ Pass O Fail Pass ❑Ail <br /> Was sensor removed for testing? es ❑No ❑NA pXes ❑No ❑NA ❑Yes ❑No ❑NA Yes ❑No ❑NA <br /> Was sensor properly replaced and i�Yes o 11 Yes ❑No NA ❑Yes ❑No ❑N <br /> verified functional after testing? ❑N ❑NA �es ❑No ❑NA <br /> Comments- (include information on repairs made prior to testing, and recommendedfollow-up forLwled tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />