My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INTERNATIONAL
>
1115
>
2300 - Underground Storage Tank Program
>
PR0231707
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:38:22 PM
Creation date
11/8/2018 9:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231707
PE
2361
FACILITY_ID
FA0003948
FACILITY_NAME
PG&E TRACY MAINTENANCE STATION
STREET_NUMBER
1115
Direction
N
STREET_NAME
INTERNATIONAL
STREET_TYPE
PKWY
City
TRACY
Zip
95377
APN
209-080-06
CURRENT_STATUS
02
SITE_LOCATION
1115 N INTERNATIONAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS3\M\MOUNTAIN HOUSE\24081\PR0231707\REMOVAL 2003.PDF
QuestysFileName
REMOVAL 2003
QuestysRecordDate
8/11/2017 9:44:18 PM
QuestysRecordID
3574680
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spec No. CGT-TRACY-UST-01-2003 <br /> General Requirements <br /> 01010-6 <br /> K. PG&E Personnel Working Conditions: Normal working conditions for PG&E personnel shall be <br /> maintained without disturbance as nearly as practicable. Work by Contractor that shall require <br /> disruptions of normal working conditions for PG&E personnel shall be indicated in the construction <br /> plan, and Contractor shall provide PG&E with its construction plan at least three (3) business days <br /> prior to any occupancy interference. Contractor's construction plan shall also disclose the nature <br /> and duration of the disruptions of normal working conditions. <br /> L. Cleanup: With respect to Contractor's own operation, Contractor shall maintain the Work site and <br /> related structures, equipment, and facilities in a clean, orderly condition during progress of the <br /> Work, and also clean up debris to the satisfaction of PG&E. If, in PG&E's opinion,the work site is <br /> hazardous due to Contractor's noncompliance, and if upon notice to correct the condition <br /> Contractor fails to do so, PG&E may stop the Work until cleanup is performed or order others to <br /> perform cleanup work and charge Contractor for this cleanup work. Building surfaces, including <br /> glass, shall be left clean. <br /> M. Overtime: Additional work shifts and overtime shall be authorized only in accordance with the <br /> General Conditions and approved by PG&E. <br /> N. Warranties: <br /> 1. In some instances specific guarantees and manufacturer's warranties are required in the <br /> Specific Conditions of this Specification. Such warranties are intended to supplement, not <br /> replace those required in the General Conditions. In the event of conflict,the longest or most <br /> stringent warranty requirement shall apply. Unless otherwise specified, repairs or replacements <br /> made under warranty shall carry the same warranty as the original equipment, material, or part, <br /> and the warranty period shall begin upon acceptance of the repair or replacement by PG&E. <br /> 2. Contractor shall assign to PG&E any warranties issued by outside equipment and material <br /> manufacturers and subcontractors. All warranties so assigned shall be in addition to and not in <br /> lieu of all warranties required under the terms of this Specification. <br /> O. Protection: Prior to commencing operations, Contractor shall adequately protect existing furniture, <br /> finishes, and equipment in the areas which may be affected by the construction work. Disposable <br /> plastic sheets or equivalent shall be placed over the workstations. All structures and buildings <br /> damaged during the performance of work under this Contract shall be repaired or replaced by the <br /> Contractor at Contractor's sole expense subject to acceptance of the repair or replacement by <br /> PG&E. All repair or replacements shall match existing materials and structures. <br /> P. Should Contractor suspect or detect hazardous materials during the performance of the Work <br /> specified, Contractor shall stop all work and notify PG&E immediately. Contractor and PG&E shall <br /> mutually agree as to the process to be utilized for resuming work. <br /> Q. Contractor shall use their best efforts to eliminate the need to operate 4 cycle or 2 <br /> cycle powered equipment at PG&E facilities on days when the local air district has <br /> declared a Spare the Air day or other air quality warning." <br /> 1.05 WORK SITE FACILITIES <br /> A. Water: Contractor will be allowed to use existing water facilities at the work site subject to such <br /> regulations as may be imposed by PG&E. <br /> B. Sanitary Facilities: Contractor will be allowed to use existing sanitary facilities at the work site <br /> subject to such regulations as may be imposed by PG&E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.