My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INTERNATIONAL
>
1115
>
2300 - Underground Storage Tank Program
>
PR0231707
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:38:22 PM
Creation date
11/8/2018 9:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231707
PE
2361
FACILITY_ID
FA0003948
FACILITY_NAME
PG&E TRACY MAINTENANCE STATION
STREET_NUMBER
1115
Direction
N
STREET_NAME
INTERNATIONAL
STREET_TYPE
PKWY
City
TRACY
Zip
95377
APN
209-080-06
CURRENT_STATUS
02
SITE_LOCATION
1115 N INTERNATIONAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS3\M\MOUNTAIN HOUSE\24081\PR0231707\REMOVAL 2003.PDF
QuestysFileName
REMOVAL 2003
QuestysRecordDate
8/11/2017 9:44:18 PM
QuestysRecordID
3574680
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spec No. CGT-TRACY-UST-01-2003 <br /> General Requirements <br /> 01010-11 <br /> continuous operation in which case estimated production rates are to be shown. Subcontract work <br /> shall be included. The schedule shall indicate procurement, shop drawings, submittals, reviews, <br /> approvals, inspections, fabrications, deliveries, float, as well as the sequence of all work. <br /> C. Contractor's Schedule Updates: Starting with the first billing after submittal of the schedule, <br /> Contractor must submit an updated schedule with each billing. If a delay is a result of items within <br /> the control of Contractor, Contractor shall submit and implement plan for getting back on schedule. <br /> If a delay is a result of items beyond the control of the Contractor, Contractor shall submit its <br /> recommendation and approximate cost for getting back on schedule. If there is a disagreement on <br /> the cause of delay, Contractor shall submit and implement its plan for getting back on schedule and <br /> notify PG&E in writing of its intent to file a claim for its work in accordance with the General <br /> Conditions. <br /> D Use of "Float" time in the schedule shall not be considered as a delay until twenty-five (25) percent <br /> of float time for any given item is utilized. At that time, it shall be addressed as a delay to the <br /> schedule. The original schedule submitted by the Contractor and approved by PG&E shall be the <br /> basis for calculating delay time. <br /> 1.10 SUBMITTALS <br /> A. General: <br /> 1. Submittals are instruments of the Contractor and defined herein to include shop drawings, <br /> product data, and samples. <br /> a. Product Data: Illustrations, standard schedules, performance charts, instruction, <br /> brochures, diagrams, and the information furnished by Contractor from the manufacturer to <br /> illustrate a material, product, or system for some portion of the Work. <br /> b. Samples: Physical examples, which illustrate materials, equipment, or workmanship and <br /> establish standards by which the Work shall be judged. <br /> 2. Contractor, at Contractor's own expense, shall furnish for review by PG&E all submittals <br /> required by this Specification. <br /> 3. Contractor shall make all submittals in groups containing all associated items as complete <br /> packages of information for review. Partial submittals shall not be accepted. <br /> 4. All submittals shall be reviewed and approved by the Contractor prior to forwarding them for <br /> PG&E's review. They shall be submitted to PG&E with reasonable promptness with minimum <br /> fifteen (15) days prior to date required to maintain construction schedule and in such sequence <br /> as to cause no delay in the Work. No extension of Contract time shall be granted for untimely <br /> submittals. <br /> 5. By approving and submitting product data, and samples, Contractor represents that the <br /> submittal is complete and that it has determined and verified all materials,field measurements, <br /> and field construction criteria related thereto; and that it has checked and coordinated the <br /> information contained within such submittals with the requirements of the Work and of the <br /> Specification. <br /> 6. No portion of the Work requiring submission of product data, or sample shall commence until <br /> the submittal has been reviewed and accepted by PG&E. All such portions of the Work shall be <br /> in accordance with accepted submittals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.