Laserfiche WebLink
Underground Storage Tank Monitoring Plan-Page 3 • <br /> F. Indirect Hazard Determination ® N/A <br /> [Note: This information is required only when the presence of the hazardous substance can not be <br /> determined directly by the monitoring method used(e.g. where liquid level measurements in a tank annular <br /> space are used as the basis for leak determination)] <br /> The following steps will be taken to determine the presence or absence of hazardous substance in the tank <br /> interstitial space if monitoring indicates a possible unauthorized release: <br /> G. Equipment Testing and Preventive Maintenance <br /> State law requires that testing, preventive maintenance, and calibration (if applicable) of monitoring equipment <br /> (e.g. sensors, probes, line leak detectors, etc.) be performed in accordance with the equipment manufacturers' <br /> instructions or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br /> Monitoring equipment is serviced: ® Annually; ❑ Other (specify): <br /> The contractors who will perform repairs and/or certification of leak detection monitoring equipment are: <br /> Equipment Type I Company Name Telephone No. <br /> Monitoring system control panels,probes, sensors. AFFORDA-TEST 209.794.0102 <br /> Line leak detectors (if installed). AFFORDA-TEST 209.794.0102 <br /> H. Personnel Responsibilities <br /> The following facility personnel are responsible for performing UST monitoring activities and/or maintaining <br /> UST leak detection equipment: <br /> Area of Responsibility Name(s) Job Title(s) <br /> Conducting routine monitoring activities. NAZIM LAKHANI MANAGER <br /> Performing periodic inspections of equipment. NAZIM LAKHANI MANAGER <br /> Reporting of alarms, leaks, equipment problems. NAZIM LAKHANI MANAGER <br /> Arranging equipment testing, servicing, calibration. NAZIM LAKHANI MANAGER <br /> Maintaining UST monitoring records. NAZIM LAKHANI MANAGER <br /> Other (specify): <br />