Laserfiche WebLink
10/22/2008 12:01 9163712450 BZ MANITANENCE PAGE 05/16 <br /> SWPCB,January 2002 page—or- <br /> 6. PIPING SUMP TESTING <br /> 'rest Method Developed By 0 Sump Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydro%tafi c <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> 87 Sump# 89 Surnp# 91 Sump <br /> Sump Diameter: 57" 17 5711 <br /> Sump Depth: 11" 57" 5711 <br /> Sump.Material; Fiberghmi Fiberglass Fiberglass <br /> T-.Teigbt from Tank Top to Top of <br /> Highest Pi in Penetration: <br /> 14" 18" 20" <br /> Fleigjit from Tank Top to Lowest 29" 2011 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"Above Piping 2"Above Piping 2"Above Piping <br /> F5o_e_s turbine shut down when <br /> Rump sensor detects liquid(both OYes ONo XNA C7 Yes rJNo XNA OYes ONo XNA 0 Yes 0 No 0 NA <br /> product and water?' <br /> Turbine shutdown response time <br /> Is system programmed for Fail-safe LlYes ONo XNA FlYes DNo XNA OYes ONo XNA D Yes 11 No 0 NA <br /> shutdown?, <br /> Was fail-safe verified to be OYcs DNo XNA OYcs DNo XNA nYw ONo XNA OYes ONo DNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 3 min. 3 min. 3 min. <br /> test: <br /> Test Start Time: 11:29 a.m. 11:29 A.m. 11:29 am. <br /> Initial Reading(Rj): 3.1818 4.1109 1.9859 <br /> Test End Time: 11:44 9.m. 11:44 a.m. 11:44&m. <br /> Final Reading(Rr): 3.1838 4.1129 1.9870 <br /> Test Duration, 15 mil". 15 min. 15 min. <br /> Change in Reading(RrRt): .0020 .0016 .0019 <br /> Pass/Pail Threshold or Criteria: .002 .002 .002 <br /> TestPasss <br /> Pala" <br /> Was sensor removed for testing? X Yes 0 No 0 NA X Yes C No U NA X Yes ONa DNA 0 Yes ONO DNA <br /> Was sensor properly replaced and XYes 0 N [INA X Yes ONo DNA X Yes ONo DNA 0 Yes ONO 0 NA <br /> veri Ctcd functional after testim? I I I <br /> Comments—rynclude L;,�fbrmatlon an repairs made pilor to testing,and recommended follow-up forfalled rests) <br /> ' If the entire depth of the sump is not tested,speeWr+mw much was tested, If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCBLO-160) <br />