Laserfiche WebLink
SWRCB, January 2002 <br />.. "` Page _ of <br />5_ SF.CONDARV PiPF. TESTING <br />Test Method Developed By: ❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 4.5 GLYCERIN FILLED GAUGE&NITOGEN <br />ANTIFREEZE GEAR 011, <br />Equipment Resolution: .5 <br />MOTOR OIL <br />SOAP <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />AO SMITH <br />AO SMITH <br />AO SMITH <br />AO SMITH <br />Piping Diameter: <br />3 INCH <br />3 INCH <br />3 INCH <br />3 INCH <br />Length of Piping Run: <br />25 FT <br />25 FT <br />25 FT <br />30 FT <br />Product Stored: <br />ANTIFREEZE <br />GEAR OEL <br />MOTOR O1L <br />SOAP <br />Method and location of <br />piping -run isolation: <br />BOOTED <br />BOOTED <br />BOOTED <br />BOOTED <br />Wait time between applying <br />pressure/ acurun/nater and <br />starting test: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time: <br />11:00 <br />11:00 <br />11:00 <br />11:00 <br />Initial Reading (Ril: <br />5.05 <br />5.03 <br />5.10 <br />5.35 <br />Test End Time: <br />1:00 <br />1:00 <br />1:00 <br />1:00 <br />Final Reading (Rr): <br />5.05 <br />5.03 <br />5.10 <br />5.35 <br />Test Duration: <br />12HR <br />2 HR <br />2 HR <br />2 HR <br />Change in Reading (RF Rj): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Resuk: <br />X Pass ❑ Fait <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />USED OIL, SLOP 1, SLOP 2 ARE GRAVITY LINES AND ARE EXEMPT TESTING PER LOCAL <br />PER LOCAL AGENCY. <br />