Laserfiche WebLink
Health and Safety Plan • Page 5 <br /> STOCKTON PROMENADE PROPERTY June 12,2008 <br /> WKA No.7345.05 <br /> drowsiness,resulting in impaired functional ability that threatens the safety of both the individual <br /> and workers. Continued heat stress can lead to heat stoke and death. Work shall follow <br /> provisions of the Heat Illness Prevention Plan that accompanies this HASP. <br /> 3.3 Site Excavations <br /> Site excavations created during initial site preparation or during material excavation will be <br /> shored or sloped as appropriate to prevent accidental collapse in accordance with 8 CCR, <br /> Chapter 4, Subchapter 4,Article 6,Section 1541 et seq. <br /> 3.4 Additional Physical Hazards <br /> Additional physical hazards associated with site operations may include slips,trips,and falls. <br /> Physical hazards will be reduced by adherence to WKA's or WKA's subcontractor's Injury <br /> Illness and Prevention Program(IIPP). <br /> 4.0 HASP IMPLEMENTATION <br /> The HASP will be made available to persons retained to assist WKA with site activities. It will <br /> also be made available for review by employees,employee designated representatives,and to <br /> personnel of any federal,state,or local agencies with regulatory authority over the site. Proper <br /> implementation of this HASP will be the responsibility of the following key project personnel. <br /> Key Project Personnel <br /> Project Superintendent Matthew Taylor Office: (916)372-1434 <br /> Wallace-Kuhl& Associates,Inc. Mobile: (916)997-7099 <br /> Excavation Competent Person To Be Determined Office: <br /> Mobile: <br /> Site Health and Safety Officer Matthew Taylor Office: (916)372-1434 <br /> (SSO) Wallace-Kuhl&Associates,Inc. Mobile: (916)997-7099 <br /> Project Manager Scott A. Armstrong Office: (916)372-1434 <br /> Wallace-Kuhl&Associates,Inc. Mobile: (916)275-03-315- <br /> The <br /> 75-0335The following sub-sections describe the responsibilities of the key project personnel. <br />