Laserfiche WebLink
Health and Safety Plan • •Page 7 <br /> STOCKTON PROMENADE PROPERTY June 12,2008 <br /> WKA No.7345.05 <br /> • Control entry and exit from the site. <br /> • Coordinate health and safety activities with the Project Superintendent. <br /> • Confirm each team member's suitability for work. <br /> • Monitor work parties for signs of heat stress and fatigue. <br /> • Monitor onsite hazards and conditions. <br /> • Implement the Health and Safety Plan. <br /> • Conduct periodic inspections to determine if the HASP is being followed. <br /> • Understand emergency procedures. <br /> • Notify,when necessary,local public emergency officials. <br /> • Coordinate emergency medical care. <br /> 4.4 Project Manager <br /> The Project Manager is responsible for the on-time,on-budget completion of the project. He is <br /> the main contact with the City of Stockton and RWQCB personnel. He is responsible for <br /> budgeting and providing the necessary safety facilities and equipment. <br /> 5.0 COMPREHENSIVE WORK PLAN •— -- Formatted:Bullets and Numbering <br /> 5.1 Expected Site Activities <br /> The site activities will involve the excavation and removal of adversely impacted soils. These <br /> activities will include the following: <br /> • Establishing site work zones, <br /> • Performing excavation,and <br /> • Loading of materials for off-site disposal. <br /> 5.2 Safety Meetings <br /> A tailgate safety meeting will be conducted at the beginning of each work shift. The tailgate <br /> safety meetings will address the hazards of the site activities and provisions for reducing the <br /> hazards as presented in this plan. The meetings will also be used for planning the various stages <br />