Laserfiche WebLink
S WRCB,January 2002 • • Page '� of ,('5 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Xiping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: xkressure ❑Vacuum ❑Hydrostatic <br /> O'Other(Spec) <br /> Test Equipment Used. N% PQ 6-tw, I i i^ SS t vdG Gn Equipment Resolution: I t a t S 3 <br /> Piping Run# Piping Run#Z Piping Run# jP1ping Run# <br /> Piping Material: Fi 1U,w (tr 33 <br /> 777 <br /> Piping Manufacturer: � ,y. U-✓t <br /> Piping Diameter: 3 L t 3 <br /> Length of Piping Run: wX,�O 4 1 5 vd k Zt� <br /> Product Stored: :e w�eke n'L-VZWF <br /> Method and location of s+Ira,k a P •s l- �,.d�-"a4- <br /> piping-run <br /> 4- <br /> i in -run isolation: <br /> Wai ' e between applying <br /> pressure/v cuum/water and <br /> fest: 45 r--i, w I <S S <br /> Test Start Time: L?-',-L5 t Z-' q 5 <br /> Initial Reading(RJ: S ()S 57 r 5 -T- <br /> Test End Time: L,- `< <br /> Final Reading(RF): P S 177 6 5 <br /> Test Duration: ke)u ✓ t kd u <br /> Change in Reading(RF-RO: ,d ST P5 <br /> Pass/Fail Threshold or 0 Lo f5 i� + ✓�' <br /> Criteria: N J Loes w S <br /> Test Result: Pass ❑Fail Pass ❑Fail ❑ Pass CI Fail ❑ Pass C7 Fail, . , <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />