Laserfiche WebLink
SWRCB,January 2002 • Page f / <br /> ' ob <br /> 5. SECONDARY PIPE TESTING <br /> Ti st Method Developed BY R Piping Manufacturer 91ndus Standard <br /> 0 Professional Engineer <br /> i.:Other(Sped) <br /> Test Method Used; <br /> res81ft [1 Vacuum 0 Hydrostatic <br /> C Other(Specify) <br /> rest Equipment used: S �jt} / E rST <br /> Equipment Resolution: pSt <br /> Piping Run# K!IE Piping Run# Q/fc Piping Run# (r/.6 Piping <br /> Pipwg Material: ping Run# <br /> pmeR irG <br /> Piping Manufacturer: Q.D.S r--p"! <br /> iDiameter. +/ <br /> Length of Piping Run: /05- S" f <br /> Product Stored: O Fr <br /> Method and location orf — <br /> i in -run isolation: E3 Boof�S "JZtrS�T Bc'bftp.5tP Ia+XT Berpr su <br /> U.D(. i fPRtT�}r+J w+ r• yt� <br /> Wait time between applying <br /> Pmssure/vacuum/water and <br /> startin mat: r0�J*{t)✓ r;;) ptr7.I <br /> Test Stan Time: � N <br /> Initial Reading(Ril: s• <br /> Test End Time; �s /5 y <br /> / ;rro <br /> Final Reading(Rv): <br /> Teat Duration: <br /> — <br /> Change in Reading(RF-Ril: B -- <br /> Pass/Fail Threshold or 3 S <br /> Criteria: S�Ps7/ S, ?t�f1 3Gr+el/a 3.o r <br /> Test Result: f5 o.>n.,rilj <br /> (a'Pm 0 Fail fir Pas 0 Fan 0 Pau 9van ❑ Pan ❑Fan <br /> Comownts—(irrclade i ormanort On re <br /> ---- -_ pairs made prior rn testing, and recommerulyd/allow-a ur ailed tests <br /> - <br /> I�ivStS7t7r7— <br />