Laserfiche WebLink
SWRCB,January 2002 • • <br /> Fags q of (� <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 17 Sump Manufacturer ❑ <br /> Industry Standard "rofeasional Engineer <br /> Test Method Used: 1i Other(Sped)0 Pyre C)Vacuum <br /> SI'Hydrostntic <br /> ❑other(Specify)Test Equipmentilsed: T!`Ei)r,A -tr ......an Resolution:*,pp2.r <br /> Sump k Sump# S770 Sump#*A& sump# <br /> Sump Diameter: <br /> Orr <br /> Sump Depth: p n / <br /> swap Material: ICYF <br /> Height from Tank To to Top of <br /> IfiRlicst Pi ' Penetration: <br /> q / nrr <br /> Height from Tank Top to Lowest V <br /> Electrical Penetration: $ r' If ( .t <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' r/ y / Z„ <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 6+Yes ❑No a NA <br /> product water 7' <br /> B des C]No rl NA i YS es ❑No ❑NA C Yes ❑No ❑NA <br /> and <br /> Turbine shutdown response time y r ,?emT T �° C E'arr�1srE <br /> is system programmed for fail-safe <br /> shutdown?' dY4es 0 No 0 NA "es L No 0 NA fYYes 0 No DNA 3 Yes U No 0 NA <br /> Was fail-safeverified to be <br /> tional7 PYYes ❑No 0 NA Vcs ❑No ❑NA Ptes C No ❑NA Ci Yes F No DNA <br /> Wait time between applying <br /> presswe/vacuwn/water and starting <br /> test: 1 <br /> .,t�thrN SDvw>✓ �Dntrty <br /> Teat Start Time: <br /> Initial Reading(Rt): /5 <br /> D e.c q/On,a goo <br /> Teat End Time; <br /> Final Reading(RF): �` '� <br /> Test Duration: r OVAL- 760 <br /> M--7u <br /> Change in Reading(RF-RJ: <br /> Pass/Fail Threshold or Criteria: 4,004teat �OD2 mt_ <br /> n <br /> Tent Brsq}f; WFAU O Fill VRaw ❑Fall "M ❑Fail ❑ <br /> Was sensor removed for testing? WYes 0 No n NA ht'f'e s r[No 0 NA Wd ,es 0 No ❑NA f i y ga"NA <br /> u <br /> Was sensor properly replaced and - <br /> verified functional after isatin 7 f�(Yea 0 No rl NA V'Yes I I No ❑NA Oyes L No L'NA ;"?Yes ❑No <br /> Comments— (include Information on repairs made rror to testing and recommended follow or failed tests <br /> ' If the entire depth of the sump is not tested,specify how march was tested. If the answer to 98y of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See S WRCB LG-160) <br />