Laserfiche WebLink
SWRCB,January 2002 <br /> ' • Page .S of <br /> 7• UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Method Developed By: D UDC Manufacturer D Industry Standard Wrofessional Engineer <br /> C Other(Specify) <br /> Test Method Used: n Pressure n Vacuum <br /> 4YEfydrostatic <br /> v Other(Specify) <br /> Test Equipment Used: - <br /> .3 OZ) Fgtripment Resolution: t p r/ <br /> UDC# 1 U LL- UDC# UA) UDC# 1 UDC# <br /> UDC Manufacturer: A D O Q A. <br /> UDC Material: L.4 <br /> UDC the r 3 OR <br /> Height from UDC Bottom to Top <br /> of Hi est Pi in Penetration: It <br /> Height from in <br /> Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: t"y0 <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both i ryes C No 1jNA SKYes No i NA VYes C No ❑NA C Yes ❑No U NA <br /> roduct and water?. <br /> Turbine shutdownresponse time T' <br /> Is system programmed for fail- <br /> safe shutdown? W'Ves C No 71 NA Co+'pes Ci No Cl NA %Kes 11 No 0 NA C yes C No "NA <br /> Was fail-safe verified to he <br /> o erational?, 610Yes n No P NA QrS'es Il No FNA Dri'ea 11 No El NA C Yes !'No [INA <br /> Wait time between applying <br /> PrEssutc/vacuum/water and <br /> starting test MI/U )arv- -ru I D Ndl..N <br /> r <br /> t Stan Time 8al Readin R!): 372 End Time: 3l Readin (Rr : Z Duration: I7 .J�. _RC1U nge in Readin RR&Tail Threshold or Criteria: <br /> Tort Result: I rPaea D Fait am Q Fail hrPau ❑Fall ❑ Pan ❑Fan <br /> Was sensor removed for testis '1 ICYea C No CNA !V1'es ❑No U NA Lr'Yes ❑No R NA C Yes L'No CNA <br /> Was sensor properly replaced and <br /> verified fiwctional after testing? 11 NO ^NA V�es n No C NA i/Yes C No C NA G Yes P No C NA <br /> Comments— include information on repair made prior to resting, and recommendcd fo!!ow-up for/oiled tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />