My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Containment • <br /> Optional tank accessories for secondary containment systems. <br /> Fiberglass Secondary Containment Collar <br /> An optional secondary containment collar provides a containment area <br /> for spilled liquids,as well as a location for the leak-monitoring sensor. <br /> Collars can be installed around other tank fittings and accessories, <br /> where space permits. Collars are constructed of fiberglass and are <br /> available in 42"diameter(with 22'manways)and 48'diameter(with 22" <br /> and 30'manways) sizes. <br /> The secondary containment collar is integrally attached to the tank top ary a <br /> to provide a watertight seal. The collar is factory installed and tested <br /> prior to shipment. Another collar leak test should be performed at the <br /> jobsite by the installing contractor. See CSI installation instructions for details. The secondary containment <br /> collar must periodically be tested for leaks—at least once each year or after collar maintenance is performed <br /> — by adding water to the collar above the tank top. The secondary containment collar must be continuously <br /> ax <br /> monitored with an electronic sensor for potential spills or piping leaks. <br /> - a <br /> Secondary Containment Fitting <br /> A 6", FRP threaded secondary coupling is concentrically positioned <br /> ' around the 4" NPT primary tank fitting. The secondary containment <br /> coupling is surface-mounted onto the tank and does not penetrate the <br /> outer wall. There is no access to the tank annular space at the 6" <br /> secondary containment coupling. To directly monitor the cavity <br /> between the primary and secondary pipe, a fitting with an access port <br /> should be installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.