My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turbine • <br /> Fiberglass Turbine Enclosures provide access to critical equipment and <br /> serve as a termination point for piping. <br /> � o <br /> a c <br /> m a <br /> Our turbine enclosures are fiberglass — a proven material for long-term performance. Compared to other <br /> unreinforced plastics and HDPE products, the rigid fiberglass construction minimizes deformation during x <br /> backfilling to help assure liquid-tight seals at fitting penetrations. d <br /> Turbine enclosures must be mounted on top of a secondary containment collar. Primary piping is installed <br /> from the submersible pump to the dispenser.When the double-wall piping is installed over the primary piping, <br /> the double-wall pipe connects to the turbine enclosure using optional fittings, available from CSI or your <br /> petroleum equipment distributor. In the event of an accidental spill from the primary piping,the spilled product <br /> will drain into the turbine enclosure and accumulate in the secondary containment collar. The secondary <br /> containment collar serves as a basin to allow early detection of leaks of the submersible pump or the product <br /> piping. <br /> When there is concern about the ingress of water at the collar/turbine enclosure seam, the turbine enclosure <br /> should be sealed to the secondary containment collar at the jobsite. Containment Solutions provides an <br /> alcohol compatible adhesive kit to make this connection. Continuous electronic monitoring of the secondary <br /> containment collar should be used to warn the operator of the accumulation of petroleum product before the <br /> liquid level rises above the collar/turbine enclosure seam. <br /> Turbine enclosures are available in 42"and 48"diameters with a minimum 2' length.To accommodate deeper <br /> burial depths, longer turbine enclosures are available in f' increments.The turbine enclosure can be trimmed <br /> at the jobsite to adjust for-the final burial depth. <br /> Note:For high groundwater conditions at or above subgrade,a sealable or watertight turbine enclosure should <br /> be used to prevent water infiltration. <br /> Warning: When a tank will be equipped with more than one turbine enclosure <br /> or manway riser, the tank may require special installation (deeper burial, <br /> additional anchor straps, etc.). Contact Tank Technical Support for specific <br /> installation details. Warning: a turbine enclosure constitutes a confined space. <br /> Never enter a turbine enclosure without proper training and OSHA-approved <br /> equipment. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.