Laserfiche WebLink
Sierra Paci � .groundwater Consultants, Inc. <br /> t 1',u�J!t ' Tpf- I-1 f <br /> HYDROGEOLOGISiS&GEOLOGISTS <br /> 4 95 AUG 28 3M 8: 45 <br /> August 26, 1996 <br /> Mr. Ed Bonds <br /> Unocal Environmental Remediation Services <br /> 2000 Crow Canyon Place, Suite 450 <br /> San Ramon, California 94583 <br /> Subject: Pre-Bid Meeting Discussion Items and Revised Bidding Schedule, Former PureGro/Brea <br /> Facility, 1905 North Broadway Avenue, Stockton, California, PureGro Site No. 771165, <br /> Unocal Order/Contract: 34402-1, Sierra-Pacific Project No. 94-055.08 <br /> Dear Mr. Bonds: <br /> This letter summarizes the items discussed with prospective bidders at the pre-bid meeting on <br /> Friday, August 23, 1996 at the PureGroBrea Broadway Avenue facility. A list of attendees at the <br /> meeting is attached hereto. The prospective bidders shown on the attendees list will serve as a <br /> distribution list for the following information. Additionally, please distribute this letter and <br /> enclosures to the other parties listed on the attached list, as requested by Nick Nickerson. <br /> Nick Nickerson stated that during construction, full level D personal protective equipment will be <br /> required, including steel-toed boots/shoes, safety glasses with side shields, high visibility vests, and <br /> hard hats. The only exception would be an equipment operator working in an enclosed cab,where <br /> the hard hat would not be required. He also stated that a mid-September start date was desired, <br /> but this is dependent upon the abandonment of a monitoring well within the southern former pond <br /> area. <br /> With regard to excavation and paving requirements for the former evaporation pond areas, the <br /> subgrade and the paved surfaces for the northern pond area will slope at a minimum fall of 2 <br /> percent from the northwest comer of the pond to the southeast comer of the pond. The asphaltic <br /> concrete (AC) should be blended to match the existing grade at the edges. The excavation of soil <br /> should be of a depth to ensure that the specified 14-inch structural section (including composite <br /> liner, shading sand, aggregate base, and paving) is maintained throughout. Thus, the depth of the <br /> excavation will be increased or decreased as needed to maintain the 2 per cent fall criterion and <br /> the structural section, while joining the existing surfaces at the edges. The join to the existing <br /> asphalt concrete along the east side of this pond will not be saw-cut, but will be cleaned of soil by <br /> excavating to the bottom of the AC prior to butting the new AC against it. This rough join should <br /> be brushed clean and tack-coated prior to paving. <br /> (916)933-1368 <br /> 4911 %Vindplay Drive.Suite 4 EI Domdo Hills.California 95762 (916)933-3197 FAX <br />