Laserfiche WebLink
(VI <br /> CONESTO ;A-ROVERS <br /> &ASSOCIATES <br /> March 24,2015 Reference No. 080238 <br /> -4- <br /> standards (including levels of service and thresholds of significance) pertinent to transportation and <br /> traffic. These observations and data will be used to establish the existing transportation and traffic <br /> setting; no original data collection activities are included. CRA staff will confer with TUSD staff to <br /> approximate the number of daily or peak hour,or both,workers/visitors expected at the Site to prepare <br /> a preliminary assessment of daily or peak hour,or both,trip generation. The assessment will compare <br /> estimated current year vehicle trips (daily or peak hour, or both)to existing traffic volumes and result in <br /> an opinion about the potential vehicular traffic impacts of the project. <br /> Draft Initial Study and Mitigated Negative Declaration: The CRA team's expertise and knowledge of <br /> CEQA,the CEQA Guidelines,and standard CEQA procedures will enable us to prepare a high quality <br /> initial study(IS)/MND. We will prepare one administrative draft document for District review prior to <br /> public circulation of the Draft IS/MND.Topics that have been identified as potential concerns.during <br /> CRA's proposal preparation include the following: <br /> • Construction and demolition noise <br /> • Cultural Resources/Historic Structures <br /> • Water quality during construction/demolition as well as operations <br /> • Hazardous material, both historic and future maintenance use <br /> • Traffic <br /> The IS/MND will address all resource areas noted Appendix G of the CEQA guidelines. CRA will submit <br /> one electronic copy and one hard copy of the administrative draft IS/MND for review and comment. <br /> Prepare Draft Mitigation Monitoring and Reporting Program: Based on the results of the analysis from <br /> the IS and discussions with TUSD,CRA will develop a draft Mitigation Monitoring and Reporting Program <br /> (MMRP) describing any required changes or adopted mitigation to avoid significant environmental <br /> effects. The MMRP will define specific reporting and/or monitoring requirements to be enforced during <br /> project implementation prior to final approval of the proposed project; examples may include dust <br /> suppression during demolition and working hours for noise during construction. We will prepare one <br /> administrative draft document for review prior to public circulation of the Draft IS/MND. CRA will <br /> submit on electronic copy and one hard copy of the administrative draft IS/MND for review and <br /> comment. <br /> Public Release of IS/MND: CRA will develop an electronic copy of the Notice of Intent (N01)for TUSD to <br /> adopt the Draft MND/IS.The NOI should be circulated for public and agency review per the CEQA <br /> Guidelines. CRA assumes that TUSD will manage publication of the N01 and submittal of the IS/MND to <br /> the State Clearinghouse and to appropriate agencies and the public. <br /> Worldwide Engineering,Environmental,Construction,and IT Services <br />