Laserfiche WebLink
a ' <br /> SAN JOAQUIN COUNTY <br /> " ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sLgov.orglehd/unitiii.html <br /> t CONTINUATION FORM Page: 4 of 5 <br /> OFFICIAL INSPECTION REPORT' Date: 4/20/2010 <br /> Facility Address: 511 N Airport Way Manteca Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> f <br /> #6 and 7. Facility failed to have a SPCC plan onsite and also failed to get the SPCC plan certified by a <br /> Professional Engineer (PE) <br /> Pursuant to Code of Federal Regulation (CFR) 112.3(d)(d) Except as provided in §112.6, a licensed <br /> Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of <br /> this part. <br /> (1) By means of this certification the Professional Engineer attests: <br /> (i) That he is familiar with the requirements of this part ; <br /> (ii) That he or his agent has visited and examined the facility; <br /> (iii) That the Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards,`and with the requirements of this part; <br /> (iv) That procedures for required inspections and testing have been established; and <br /> (v) That the Plan is adequate for the facility. - <br /> (vi) That, if applicable, for a produced water container subject to §112.9(c)(6), any procedure to <br /> minimize the amount of free-phase oil is designed to reduce the accumulation of free-phase oil and the <br /> procedures and frequency for required inspections, maintenance and testing have been established and <br /> are described in the Plan.(e) If you are the owner or operator of a facility for which a Plan is <br /> required under this section, you must: <br /> (1) Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four <br /> hours per day, or at the nearest field office if the facility is not so attended, and <br /> (2) Have the Plan available to the Regional Administrator for on-site review during normal working <br /> hours. <br /> Immediately, prepare a SPCC plan and have the plan certified by a PE. Submit the certified page to <br /> EHD as proof of corrective action by 5123110. Also keep a current copy on site for record. <br /> #8 and 11. Facility stated the the location of the 2 - 10,000 gallon AST has been changed in the past 4 years. <br /> Facility also failed to have a'PE certify technical ammendments. Facility diad not amend the SPCC plan within 6 <br /> months pursuant to CFR 112.5(a) and pursuant to CFR 112.5(c)have a PE certify the change within 6 months of <br /> the change. <br /> Make sure that all applicble change is made in a timely manner and all technical amendments are certified by a PE. . <br /> #10. The facility has been in business for past 40 years and the AST have been at the facility prior to 2002. <br /> Faciltiy failed to review and evaluate the SPCC plan at least once every 5 years pursuant to CFR 112.5(b). <br /> Make sure a review and evaluation is performed on the SPCC at once every 5 years. <br /> #18. Facility failed to provide facilty diagram that shows the location and content of eachcontainer as required by <br /> CFR I I2.7(a)(3). Immediately, prepare a facilty diagram and keep a copy at the facility for record and review. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL eE BILLED AT THE CURRENT HOURLY RATE($11$). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By, Title: <br />