My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act roactivel to identlfv and miticiate hazards to the safest extent of their ability. <br /> IN <br /> . 7shoes, <br /> Purge wells using a battery Steel toed andrelectrocution, <br /> rical shock, • Currently STANTEC is using 12 Volt Direct Current (DC) <br /> operated pump long sleeve shfirehazards, submersibie pumps (model: Tempest Proactive Environmental <br /> safety glasses -contamination. Products www.gopronow.biz). USE BATTERY CLAMPS ONLY ON <br /> shields, hearing protection, THIS PUMP-STANTECI <br /> reflective safety vest, and • The manufacturer recommends a minimum 12 volt to maximum'15 <br /> leather gloves for the non- volt DC power supply. DO NOT PLUG INTO ATERNATING <br /> chemical aspects of work as CURRENT(AC) OUTLET-STANTEC? <br /> necessary. If you suspect that • The manufacturer recommends using a mobile battery power pack, <br /> equipment is contaminated, gas generator or vehicle battery to power the 12 volt DC submersible <br /> wear chemical resistant gloves. pump- STANTEC. <br /> Wear appropriate air-purifying • When using a vehicle battery power supply it is important to turn <br /> respirator with combination on the vehicle and run for 2 minutes every 30 minutes in order to <br /> organic vapor/P-100 cartridges maintain charge in the vehicles battery-STANTEC. <br /> as needed.Wear appropriate <br /> chemical resistant suit as • Prior to inserting the pump into the well, connect the pump to a,. <br /> nitrile gloves, Traffic Vest, <br /> needed. Level PPE with length of 318-inch id low or medium density polyethylene tubing- <br /> ;' STANTEC. <br /> Exclusion Zone Equipment, • These pumps are designed for minimum 2-inch diameter wells. <br /> Leather Work Gloves. Lower the pump into the well so that the pump intake is submerged. <br /> (Higher pump rates will be achieved when the pump is lowered near . <br /> the bottom of the well, but not the end of the well)__STANTEC.. <br /> k • Connect the pumps negative alligator clamp securely to the <br /> negative-term inal_omthe.power supply:Then connect the positive <br /> clamp to the positive terminal. The pump should now be energized. <br /> Continuous pump operation is suitable when placed in water. If <br /> running dry, damage may occur within two hours of continuous use- <br /> STANTEC. <br /> • When purging of the well is completed, disconnect the pump from <br /> the power supply by first removing the positive clamp and then the <br /> negative clamp-STANTEC. <br /> • When the pump is removed from the well, hold the pump in the <br /> upright position so that all water is drained from the unit-STANTEC. <br /> Decontaminate the pump by immersing into a bucket of warm <br /> water with non-phosphate detergent. Attach the pump to the power <br /> supply and allow the cleaning the pump. <br /> Repeat with clean water-STANTEC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.