Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all upfront logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety. <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)ISafe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> shou_Id act proactively to ide tify and mitigate hazards to the safest extent of their ability- <br /> Collect <br /> bilit . <br /> Collect samples in Steel toed and shank shoes, Cross-contamination. Back Use proper lifting and bending techniques. Use knee pads or a <br /> accordance with sampling long sleeve shirt, hardhat, strain, inhalation or dermal kneeling pad-STANTEC/Contractor. <br /> plan. safety glasses with side exposure to chemical . Determine the best location to set the sample containers (avoid <br /> shields, hearing protection, hazards, slip and fall. stepping on them, or other materials coming into contact with them)- <br /> reflective safety vest, and Improper labeling or STANTEC. <br /> leather gloves for the non- storage, injury from broken * Label samples in accordance with sampling plan-STANTEC. <br /> chemical aspects of work as sample bottle (cuts or acid Az <br /> necessary. If you suspect that burn). Note: If a sample • Fill sample containers slowly and over a bucket to eliminate <br /> equipment is contaminated, bottle breaks while potential spills. Or place sample container on bucket lid on the <br /> wear chemical resistant gloves. sampling, follow the ground or other surface, then fill container. To avoid sample <br /> Wear appropriate air-purifying guidelines listed below for container from slipping out of your nitrile gloved hand-'STANTEC. <br /> respirator with combination proper containment and <br /> organic vapor/P-1 00 cartridges disposal of broken glass. • Do not over pack cooler-STANTEC. <br /> as needed.Wear appropriate • Use bubble wrap or other insulating material for cushioning sample <br /> chemical resistant suit as. <br /> needed. Level D'PPE with containers in.the cooler-.STANTEC. . <br /> nitrile gloves, Traffic Vest, • Keep samples stored improper containers, at correct temperature, <br /> Exclusion Zone Equipment, and away from work area. Handle bottles carefully- <br /> Leather Work Gloves. STANTEC/Contractor. <br /> • Perform personal decontamination procedures <br /> STANTEC/Contractor. . . z. <br /> * • Drop off tools and perform equipment decontamination procedures <br /> on the equipment:STANTEC/Contractor. <br /> • Remove inner/outer gloves and dispose of properly- <br /> STANTECIContractor. <br /> w <br /> STANTEC Consulting Corporation <br /> 13-16 ' <br /> ��_ <br />